My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-12-2004 Council Packet
Orono
>
City Council
>
2004
>
01-12-2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:38:26 PM
Creation date
1/19/2023 12:27:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2004 <br />RATE SCHEDULE <br />(Municipal) <br />ClaiilflcaHoa <br />Senior Principal <br />Principal | Senior Project Manager <br />Specialist* <br />Project Manager | Planner <br />Registered Engineer/Architect/Landscape Architect <br />Senior GIS Designer | Water Resource Specialist <br />Project Engineer/Architect/Scientist/Landscape Architect <br />GIS Designer | Senior Designer <br />Graduate Engineer/Architect/Scientist/Landscape Architect <br />Senior Draftsperson <br />Draftsperson <br />Project Technician <br />Senior Field Supervisor <br />Field Supervisor | Senior Crew Chief <br />Senior Inspector <br />Inspector | Crew Chief | Senior Technician <br />Technician <br />GPS Survey Equipment <br />Total Station Equipment <br />GIS Workstation Equipment <br />GPS Submeter Unit (per half day) <br />Attendance at Regular Council Meeting <br />Specialist: Experts in highly technical disciplines. <br />2m <br />$106.00 <br />$101.00 <br />$135.00 <br />$ 96.00 <br />$ 87.00 <br />$ 87.00 <br />$ 76.00 <br />$ 74.00 <br />$ 70.00 <br />$ 60.00 <br />$ 55.00 <br />$ 38.00 <br />Change <br />2% <br />3% <br />2% <br />3% <br />2% <br />2% <br />2% <br />4% <br />3% <br />3% <br />3% <br />3% <br />2004 <br />$108.00 <br />$104.00 <br />$138.00 <br />$ 99.00 <br />$ 89.00 <br />$ 89.00 <br />$ 78.00 <br />$ 77.00 <br />$ 72.00 <br />$ 62.00 <br />$ 57.00 <br />$ 39.00 <br />$ 81.00 <br />$ 71.00 <br />$ 61.00 <br />$ 56.00 <br />$ 40.00 <br />6% <br />6% <br />4% <br />3% <br />3% <br />$ 86.00 <br />$ 75.00 <br />$ 63.00 <br />$ 58.00 <br />$ 41.00 <br />$ 30.00 <br />$ 25.00 <br />$ 20.00 <br />$ 75.00 <br />$ 50.00 <br />Direct Project Expenses - At Cost: Reproduction, printing, duplicating, mileage and any out of pocket <br />expenses such as stakes, field supplies, telephone calls, etc. <br />These rates are adjusted annually in accordance with the normal review procedures of Bonestroo, <br />Rosene, Anderlik and Associates, Inc. <br />City of Orono <br />; '
The URL can be used to link to this page
Your browser does not support the video tag.