My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
06-15-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 11:28:31 AM
Creation date
1/19/2023 11:04:28 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. W <br />V ' <br />.■ 'ri ‘'-^i <br />^im Zoning File #1743 <br />June 8, 1992 <br />Page 3 <br />2. <br />4. <br />is <br />■KAi; <br />■ .r-"! <br />it- : ' <br />Applicant to grant Flowage and Conservation Eaaement <br />over all designated wetlands within the plat. Wetlands <br />to the north and east of the property to be designated <br />at the 932.3 elevation. This shall also include area <br />defined as low wooded area within proposed Lot 2. <br />Septic test sites within Lots 2 and 3 shall be staked <br />prior to required land alterations for road and <br />drainage improvements. <br />Structure located within Lot 2 close to west lot line <br />shall be removed prior to final plat approval. On-site <br />Septic Manager shall be advised of time of removal to <br />ensure there is no damage done to the septic test sites <br />on Lot 2. <br />Applicant shall file a separate conditional use permit <br />for guest house use as structure will continue to be <br />used for non-rental residential use. <br />The following Improvements or structures are recognized <br />as non-conforming based on either their substandard <br />setback to the shore of Tanager Lake or to the <br />designated wetland. All structural repairs to these <br />non-conforming structures shall require approval of the <br />City of Orono. The non-conforming structures are as <br />follows: <br />a. <br />b. <br />c. <br />Guest house on Lot 1. <br />.Detached garage on Lot 1. <br />lt '-"' <br />Tennis court on Lot 1. <br />Based on the Planning Commission's resolve of the <br />access issue# the City will accept the original road <br />plans submitted for private road construction for 5-lot <br />plat or if a driveway is to be permitted, the City will <br />ask for plans for the driveway to ensure positive <br />drainage is maintained per DNR and MCWD standards. The <br />City Engineer will be asked to review and approve the <br />driveway plans prior to installation of road to ensure <br />guidelines are satisfied. Applicant's consultant has <br />asked for a refund of the private road fees submitted <br />with 5-lot plat. The City will wait until the City <br />Engineer has completed his review of the 3-lot plat <br />before a refund is determined. <br />••vri <br />»" <br />y.
The URL can be used to link to this page
Your browser does not support the video tag.