Laserfiche WebLink
:'tr <br />PROGRAM (cont.) <br />Conm. No. 9201 <br />BUILDING PROGRAM <br />The following functions and their respective requirements are to <br />be accommodated in the master plan for the arena: <br />Flinction <br />200' X 30 meter Olympic rink surface <br />with 24' radius comers with dasher boards <br />and protective screen (preferably glass). <br />Double gate for Zamboni, preferably in <br />straight section. Players boxes and timer/ <br />p)enalty boxes opposite from seating. <br />Ice surface and ice making equipment should <br />be based on 6 month operation and allow for <br />other uses during down time. <br />Spectator Area <br />Approximately 1,000 seats in bleacher type <br />stands which could be over dressing rooms or <br />storage. Elevated seating at dasher boards <br />for good visiblity. <br />Team/Dressing Rooms <br />Four rooms of capacity for 20 players <br />(approximately 12' x 24’) with easy access <br />to ice. Toilet and shower should be planned <br />for joint use two rooms, although first <br />phase may not include. <br />Toilet/Shower (future) 2 at 150' sq ft <br />m I <br />Officials/First Aid <br />Small room for game officials storage and <br />changing with storage for first aid supplies. <br />Zamboni Room <br />Heated area for storage of machine, ice <br />making and grooming equipment, nets, work <br />bench, hot water heater, and snow melting <br />if necessary. Room to have overhead door <br />access to ice surface, outdoors, and <br />future outside rink. <br />Refrigeration/Mechanical Room <br />Room near rink to house ice making <br />equipment and building mechanical systems <br />(ie heat reclaim). <br />19,000 sq ft