My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
06-15-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 11:28:31 AM
Creation date
1/19/2023 11:04:28 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m % <br />ORONO ICE ARENA <br />Comm. No. 9201 <br />April 29, 1992 <br />V.-^1 <br />vr,- <br />INTRODiJCTION i^^.. <br />The enclosed report constitutes our analysis of a nulti-use.sports facility <br />for the Orono area. This project is a follow-up to the 1990 s^dy for a <br />multi-purpose recreation center on Old Crystal Bay Road. The .initial <br />objective was to develop a ice skating facility on the northeast comer of <br />school property they indicated could be available. A site area was <br />determined .and negotiated with the school. Unresolved requirements are <br />the sewer and water service. <br />*'4 <br />Over the past few months the project T<ras progressed thru site studies and <br />meetings with the hockey boosters and sports facility committee to develop <br />the enclosed program and design on the proposed site. Consideration and <br />analysis of accornnodating park desires, little league fields, alternative <br />sites, sewer and water, etc. has resulted in a number of site pl^s and <br />site development cost estimates which are included in the appendix <br />(master copies only).[9 <br />Soil tests have been taken to determine the suitobility of the site for this <br />use as well as site development costs. Discussions have been held with city <br />and county officials regarding requirements for construction, parkii^, <br />county road access and approval process. Some of the foregoing is included <br />in the appendix (master copies only). <br />The resultant concept and cost projections are presented.herewith for use <br />as a basis of fund raising and negotiations and/or approval of the Orono <br />area community. <br />% <br />Respectfully submitted <br />DELANO ERICKSON ARCHITECTS <br />Del Erickson, AIA <br />Registration No. 7137 <br />IWiSr-w . - ' <br />DDE/se <br />ismavi- <br />HR <br />i r - <br />wmmm <br />'■.v;.csimwmm <br />F- <br />i. -■ . '"Or*" <br />1*fj- <br />V ■. <br />‘ -sVv • -.v-. <br />- .-itS , <br />1. <br />i;*;.» <br />;I--, i, „■ ,
The URL can be used to link to this page
Your browser does not support the video tag.