To: <br />Date: <br />Subject: <br />\ 1 <br />Council <br />From: Michael P. GaffrbnJ On-Site Systems Manager <br />April 2l|., 1980 <br />Mtka Bluffs - Orono Lane - W. Perndale - Co. Rd. 15 <br />Sewer Questionnaire Returns <br />Below is an update on the questionnaire returns for the proposed <br />sewer project. <br />A. Minnetonka Bluffs <br />21 of 27, or have returned the questionnaire. Of these <br />21, 1i| are in favor of sewer and 7 want to remain using on-site <br />systems. Of the remaining 6, at least 1 is probably in favor <br />and the rest are noncommittal. <br />I recommend that we proceed by ordering the improvements <br />and call for preparation of plans as soon as possible. The <br />alternative course of action would be to proceed with hazardous <br />building condemnations and attempt to repair, replace, or remove <br />existing systems as necessary to ensure compliance with State <br />and local codes. <br />B. County Rd. 15 - Marina Area <br />4. of 7 have returned the questionnaire; however, we have had <br />contact with all but Dave Duff regarding their views on:the_ <br />project. Mrs. Gregory, owner of the parcel south of the railroad <br />tracks which was not assigned any units, called to indicate she <br />would not return the questionnaire since she was not really <br />involved in the project. The property owners in the immediate <br />marina area have all indicated objection to the high cost of the <br />project and wish to continue with on-site systems unless a less <br />expensive project is proposed. Holding tanks would bo the only <br />acceptable method of on-site sewage disposal for these properties. <br />I recommend that wo continue our efforts in getting MWCC <br />pomnission to piamp directly into the force main. Based on our <br />eventually obtaining this permission, we should then proceed with <br />ordering the improvements and call for preparation of plans. <br />C. Orono Lane , ^ ^5 of 10 have returned the questionnaire, with J in favor <br />of sewer Alternate II and 2 who want to continue using on-site <br />systems. While the response here has been scanty, I roust <br />recommend that we proceed with a project since two-thirds of <br />the Orono Lane area systems are non-conforming and in some <br />cases are failing miserably. Making these systems conforming <br />would be expensive and on some lots not feasible. <br />D. West Perndale , ^ j „Of 17 properties which deUnitely would be assigned a sewer <br />unit, 15 have returned questionnaires. Of these 15» 12 are in <br />favor of sewar and 3 Of th.6 12 in favor^ 7 want Aa.t«II <br />(pressure), 3 want Alt, I (gravity), and 2 will go either.way. <br />In addition to the 17 definite units, 3 properties have extensive <br />li