Laserfiche WebLink
1. <br />Zoning File #1785 <br />November 13, 1992 <br />Page 3 <br />proposes a realignment of all three properties whereby proposed <br />Lots 2 and 3 will have lakeshore. The existing structure on Lot <br />3 will now meet the required 10' setback from the side lot line <br />where structure had originally encroached into 610 Bi'^ Island <br />approximately 1-2', The existing structure on Lot 2 is located <br />approximately 4* from the newly proposed side lot line between <br />Lots 2 and 3, Per Section 10.31, Subd, 18 (E), no setback can be <br />reduced to less than 10'. The proposed lot line arrangment can <br />not be approved unless applicant proposes the removal and <br />replacement with a conforming structure. Refer to Exhibit F. <br />Proposed Lot 1 provides applicant with higher and dryer <br />elevations to north Increasing the building envelope. <br />Based on lot widths, proposed Lot 1 will be required to meet <br />a 30* interior lot line setback based on the 120' width measured <br />at the Intersection of the side lot lines with the 75' setback <br />line. Proposed Lots 2 and 3, because their lot widths are less <br />than 100' in width, will be required to meet a 10' interior lot <br />line setback. As proposed Lot 3 is located adjacent to a street <br />at both the north lot line and the south lot line, a 30* setback <br />would be required if new construction was proposed. <br />The second part of the subdivision application involves the <br />creation of easements for the purpose of sharing an on-site <br />septic system. The drainfield area is to be located on proposed <br />Lot 2 with tanks installed on proposed Lot 1. Please review <br />Exhibit D, Weckman's memo, both Lots 1 and 2 are proposed for new <br />construction with cabins having two bedrooms, bathrooms and <br />kitchen sink. On-site sewage treatment is required. Test <br />information confirms adequate area for a four bedroom mound <br />system. A 10' setback variance will be required between the <br />shared lot lines of proposed Lots 2 and 3 because septic tanks do <br />not meet the required 20* setback from shared lot line. Each of <br />the parcels will grant easements in favor of each other to allow <br />the shared use and maintenance of the septic system. Weckman <br />notes this is the only suitable area on both properties for <br />septic use and that no alternate site is available but finds no <br />problem as cabins are seasonal and would not be used to capacity <br />for extended periods. <br />The sharing of a septic system would not be in conflict with <br />the MPCA or the City of Orono on-site septic standards. In fact, <br />this may be a solution for several properties on Big Island where <br />outhouses exist and do not conform to the required separation <br />distance to OHWL - such as the outhouses on both of these <br />properties. Staff has conditioned approval of this shared septic <br />system based on the granting of mutual easements and subject to <br />the limitation of the number of bedrooms to two for both <br />properties. It is also suggested that covenants define location <br />of test site on property in order to assure protection during <br />construction and with future seasonal recreational use.