My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
10-19-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 10:34:49 AM
Creation date
1/19/2023 10:18:15 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITYofORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.3108 <br />prooosed level of use of the property will be in keeping <br />with the intent and objectives of the Zoning Code and <br />Comprehensive Plan of the City. <br />7.The City Council has considered this renewal application as <br />amended including the findings and recommendations of the <br />Planning Commission, reports by staff and comments of the <br />applicant and the effect of the proposed use on the health, <br />safety and welfare of the community. <br />CONCLUSIONS, ORDER AND CONDITIONS <br />Based upon one or more of the above findings, the Orono City <br />Council hereby grants a conditional use permit per Municipal Zoning <br />Code Section 10.03, Subdivisions 19 & 20 to permit the placing or <br />10,u00 cubic yards of fill as approved by the City Engineer, subiject <br />to the following conditions: <br />1.Prior the hauling of fill to the site, the applicant or <br />applicant's agent must submit a filling and grading plan for <br />the City Engineer's review. Such plan shall adhere to the <br />following guidlines: <br />A} Side slopes 5:1 ratio; <br />B) <br />C) <br />1% slope to be maintained within inner fill area; <br />Silt fence installed 30-35' from wetland at 972 <br />elevation — no land alterations allowed withxn 26 or <br />wetland; <br />2.Executed developer's agreement and appropriate security to <br />en.-.ure final grading and seeding if fill project is not <br />completed. <br />3.Fill shall not exeed allowed amount of 10,000 cubic^ <br />Side slopes to be graded and seeded periodically during the <br />course of the project. The Orono staff is to advise <br />applicant or applicant's agent when seeding is to be <br />conducted. <br />Pag^ 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.