My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-21-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
09-21-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 10:10:10 AM
Creation date
1/19/2023 10:00:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JLI t. <br />* i MENARDS <br />i.rx* <br />t ⢠<br />ft <br />IrM <br />L <br />^.* . f <br />OW(P <br />ICO^l^Z m <br />1. GENERAL <br />Prior to beginning construction, the area selected for the shed location must be leveled and <br />cleared of obstructions. <br />Z. INVENTORY <br />Separate all lumber, hardware, etc. into individual stacks of like items. <br />3. FRAME <br />PREPARATION <br />Unfold each frame, setting <br />aside two frames to be used <br />as end walls. From l"x4ā <br />Pine boards, cut Gusset <br />plates 6" long.20 for a 10' <br />building. 24 for a 12' <br />building or 28 for a 14' <br />building. Apply gusset plates <br />on each side of the top and <br />bottom fold locations. <br />Frames to be used as end <br />walls require only one gusset <br />plate at top and bottom on <br />the side opposite of the <br />metal plates. Use four 8d <br />nails on each gusset plate. <br />See Figure 1. <br />iFt^uftfe i: <br />x*i/a»; <br />6id« Wan Fi <br />M«a <br />Iāx4 <br />Traatad x"m4ā* <br />Bottom Fraaa <br />at bottaai laid <br />i ISKI <br />EZ BUILD SHED FRAME <br />i
The URL can be used to link to this page
Your browser does not support the video tag.