My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-21-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
09-21-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 10:10:10 AM
Creation date
1/19/2023 10:00:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
jr <br />To:Chairman Kelley and Planning Commission Members <br />Ron Moorse, City Administrator <br />From:Michael P. Gaffron^ Asst Planning & Zoning Administrator <br />Date:September 17, 1992 <br />Subject: #1621 Terry and Jonell Johnson, 1045 Linden Lane <br />Variance - Continuation of Public Hearing <br />Application: Hardcover and setback <br />remodeling of residence <br />variances for major <br />List of Exhibits <br />Exhibit A <br />Exhibit B <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Revised Survey with Grading Plan <br />Plan "D" Floor Plan and East Elevation <br />Notice of Planning Commission Action 3/21/91 <br />Planning Commission Minutes 2/19/91 & 3/18/91 <br />Memo and Exhibits 3/11/91 <br />Note: The property owners list has been renotified. <br />Discussion <br />The applicants have again revised their plans, which were <br />last reviewed by the Planning Commission in March 1991 and tabled <br />for revision. A grading plan was also required. <br />A grading plan has been submitted and appears to provide a <br />swale and driveway apron slopes which are intended to intercept <br />runoff coming down the driveway and move it around the garage, <br />while maintaining the general runoff pattern as previously <br />existed. <br />Since the last floor plan review, the following revisions <br />have been made (compare this with the Plan C changes on the March <br />11, 1991 memo): <br />1. Bumpout addition at northeast corner has been reduced. <br />2.The upper story decks on the lake side have been <br />eliminated. <br />3.The garage and recreation area above it have been <br />shortened slightly and pulled back to meet the required <br />10* side setback. <br />Hardcover in the 0-75* zone appears to be identical to the <br />7.2% proposed with Plan C. In the 75-250' zone, the reductions <br />in the garage and room additions amount to approximately 117 <br />s.f., or 39.7%. The 250-500' zone still proposes significant <br />removals leaving 23.3%. The table below summarizes the hit.tory <br />of revisions to these plans.
The URL can be used to link to this page
Your browser does not support the video tag.