My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-21-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
09-21-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 10:10:10 AM
Creation date
1/19/2023 10:00:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tos Chairman Kelley and Planning Commission Members <br />Mayor Peterson and Orono City Council <br />Ron Moorse, City Administrator <br />Pron:Michael P. Gaffron, Asst. Planning & Zoning Administrator <br />Date:September 18, 1992 <br />Subject: #1763 Woodhill Country Club - Conditional Use Permit <br />(Now After-the Pact) - Public Hearing <br />Application: Conditional use permit for land alterations (approximately <br />10,000 cubic yards) for safety improvement to driving range area of golf <br />course. <br />List of Exhibits <br />Exhibit A <br />Exhibit B <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Exhibit F <br />Exhibit G <br />Exhibit H <br />Application <br />Plat Map <br />Property Owners List <br />Survey/Grading Plan <br />Air Photo Overlay <br />Letter of Request <br />City Engineer's Comments <br />Stop WorJc Order Letter dated 9/18/92 <br />After the Fact Status of Applicati( <br />Please review the stop wor)c order letter dated September 18th. <br />Briefly, the applicant began working with Mark Gronberg earlier this year <br />to develop a grading plan to protect golfers from the driving range. Late <br />in the process it was determined that the project was likely located in <br />both the cities of Wayzata and Orono. A Wayzata permit was obtained and <br />the Orono conditional use permit was applied for in late August. <br />During the site inspection as part of the application review on <br />September 15th, staff found that work was in progress. A stop work order <br />was issued on September 16th when staff determined via air photo overlay <br />maps that almost the entire project was in Orono. However, no survey work <br />has been provided to establish the City .. oundary nor the portion of work <br />which actually will occur in Orono. Please see the attached air photo <br />overlay. <br />Merits of Laud Alteration Permit Request <br />Please review the City Engineer's comments. Exhibit G. His <br />recommendation includes the following points: <br />1. The 2.5 to 1 slopes need protection from erosion until sod has <br />been established. <br />2.Slopes will be difficult to maintain, although the applicant <br />indicates such slopes are regularly maintained on the golf course <br />today.
The URL can be used to link to this page
Your browser does not support the video tag.