Laserfiche WebLink
Mlnutds of tho r«ouldr Planning Ccr».»lii«lon i.xjoMn'i, .'.onJJV* ••jy <br />5 ;C»‘l <br />V*f <br />' V <br />K^f)0 •! <br />trot It %^ld to o hjrd'^hlp to hin 1o h:vu tu coi.iply with <br />tha 5 acra lalnlnun lot alzu^ arvJ^ thuroforo, j varl-nacu \fOulJ tu <br />appropriate. A contour nup was to ba provhi.nJ botwru ti.o i.oxt <br />Plsnnlnj Caanli.lon Muutlno to allow a bofv.jf <.Iulur;iln.»rlo(» <br />to whara tho buit locution mlynt t>a for tiio lor lit.u. <br />Kuilbarg novad, Curtis saconduJ, that o Public i.ourlnj U» scNod- <br />uiad tor Juna 17, 1974, Ayas (8) Maya (0). <br />i4r. Itollohdar, at ttui prasant tima, has a garaQo n»at Is locatod <br />right on tha road right-of-way. Mr, Hollander has submitted plans <br />to mlocata a naa garaga 22* from tha North Arm Orivo right-of-way <br />Tha plan Indicatas an Irraguiar shapad structura which would In- <br />frlnga on tha 75* satback raquiramant from tha lake. If that <br />portion of tha garaga Is a dack, than no variance Is nacassary, <br />but If It Is part of tna geraga, a variance would have to be <br />granted from that portion of tha ordinance. VanNest moved, Kull- <br />barg seconded, that a variance be approved as It would be an Im­ <br />provement In tha axisting conditions with the stipulation that <br />no portion of tha structura ba located closer than 75* to the <br />laka and that tha oxisting garaga ba removed within 30 days after <br />the completion of tha nau geraga. Ayas (U) iiays (0). <br />Richard Hollander ✓ <br />VarIanca <br />Tha Zoning Administrator Informed tha Planning Commission thal <br />tha Gagne project was placed on tha agenda as an Informational <br />Item and that no action should ba taken until the comprehensive <br />plan, or more specifically, tha Plan Study Area for the prope»*ty <br />Involved, Is completed. Chairmen Venifast Informed the petition­ <br />er that the extension of the Hockbarry sewer line had been do- <br />latad from the present sawar project, and, therefore, the only <br />possibility for thalr proposal Is to run their sewage through <br />the existing sawar line through Long Laka. The Zoning Adminis­ <br />trator was Instructed to find out It capacity was available In <br />iha sewer line, and If so, how many uolls could ba handled on tho <br />existing line. Hr. Nielson and Mr. Gagna suggested to the Plan­ <br />ning Caaalssion that they consider allowing approval of this <br />project In stages so that they could get started as soon os pos­ <br />sible. Present plans coll for storting tha residential portion <br />of the project first which would Include Apartments ana townhouses <br />across from the school complex. <br />Wl 11 lam CagtiU <br />Shopping Center <br />Curtis nx>vad, Guthrie seconded, thet this application be tabled <br />until the Plonning Conelssion can determine if soMr Is evollable <br />and until the comprehensive plan Is completed. Ayes (6) Nays (0). <br />I <br />Mr. Streley was Informed thet Orono Is In the'process of re-wrIting <br />Its D-2 potion of the ordinence relating to lakashore-commerclal <br />activities. In addition, the L.H.C.v. has placed a moratorium on <br />the Issuance of multiple dock llcen»>v. 'd, therefore, the City <br />cannot process tha application at f^.» r v». <br />Stan Strolay <br />Marina LIconsa App! <br />Ca^ch movad, Cuthrla aaoondad, to table the Sfraley application <br />for a Itarina LIcansa. (Ayas (8) Nays (0). <br />»• ** <br />. . <br />. V* ‘ <br />. <br />0 * <br />ar» <br />k:' <br />** Jl; “»■ • • ^V •' - - ‘rfX - ' <br />>•