My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
08-17-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 9:26:22 AM
Creation date
1/19/2023 8:59:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
At* <br />♦ <br />;■' i <br />' •:•.■• <br />r^‘*- <br />i.® <br />. ' ■• • <br />at V -.1- <br />•I m <br />•■#‘r- <br />..JLi <br />I." <br />r*> ?'.-^'i <br />!:r' <br />TWraODUCTION <br />ORONO ICE AREM^ <br />Coran. No. 9201 <br />April 29, 1992 <br />m • * <br />The enclosed report constitutes our analysis of a milti-use.sports facility <br />for the Orono area. This project is a follow-up to the 1990 stu^ for a <br />milti^purpose recreation center on Old Crystal Bay Road. The .initial <br />objective «as to develop a ice skating facility on the imdieaat comer of <br />sdiool property they indicated could be available. A site area was <br />determined .and negotiated with the school. lAiresolved reit'jirenents are <br />the sewer and water service. <br />0^ the past few months the project was progressed thru site studies and <br />meetings with the hockey boasters and sports faciU^ coranittee to develop <br />the enclosed program and design on the proposed site. Consideration and . <br />analysis of aceonnodating park desires, little league fiel^, alternative <br />sites, sewer and water, etc. has r^lted m a number of site plm and <br />site develojgnent cost estimates \diich are included in ^ appendix <br />(master copies only). <br />Soil tests have been taken to determine the suimbiliQr of the site for this <br />use as well as site development costs. Discussions have been held with city <br />and county officials regarding requirements for construction | parkiM, <br />county road access and appr^l process. Some of the foregoing is included <br />in ^e appendix (master copies only). <br />The resultant concept and cost projections are presented.herewith for use <br />as a basis of fund raising and negotiations and/or approval of the Orono <br />area eoamxiity. <br />Reapectfiilly submitted <br />% <br />DELANO QtIGKSON ARCHITECTS <br />fV ‘w o <br />^ -I ' ; <br />Del Erickson, AIA <br />Registration No. 7137 <br />> K \ t ‘ ii> <br />E/se <br />I ■ <br />. %:t,.■ <br />■ V <br />V • ^ <br />; !*■ <br />mmi <br />1. <br />iiilwhrvi fiiiirnnsAi' <br />1 <br />r.
The URL can be used to link to this page
Your browser does not support the video tag.