Laserfiche WebLink
u> TT—ii r in <br />M <br />p;i <br />Scheme No. 3 - <br />This scheme represents further reduction of office space <br />down to 52»000 s.f., but adds 192 units of multi-family with 110 <br />units of town houses. <br />Scheme No. 3 differs from Schemes 1 and 2 in the frontage <br />road area by having principally the single facing frontage road <br />abutting Highway 12 as a means to buffer the expanded residential <br />property from Highway 12. It allows for safe stacking distance <br />back from the intersections at Willow Drive# Highway 12# and Old <br />Crystal Bay Road. <br />Alternative 3 i <br />Area 3 <br />Fig. 26 <br />1 <br />. i <br />I