My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-1992 Planning Packet
Orono
>
Planning Commission
>
1992
>
08-17-1992 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 9:26:22 AM
Creation date
1/19/2023 8:59:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
!l <br />I: <br />- Development within existing capacities* In developing <br />alternatives for this area, the Consultant presented 4 <br />schemes for development in this area. In addition, the most <br />affected property owners presented their own development <br />scheme. The first 4 schemes provide for frontage road <br />connection between Old Crystal Bay Road and Willow Drive and <br />other circulation to the site, together with retention of <br />appropriate wetlands. Such developments are within the realm <br />of "existing capacities" without requiring substantial <br />capital investment to any metropolitan systems. The first <br />four schemes represent varying degrees of transition from <br />commercial along Highway 12 to multi-residential up to the <br />wetlands with low density single family between the wetlands <br />and County Road 6. <br />Scheme 5, as proposed by the property owners, would necessitate <br />the construction of a new sewer line to the Long Lake plant, with <br />resulting sewer units in the range of approximately 1,200. This <br />may still be within existing metropolitan interceptor capacity <br />but would put a greater burden on the system than the selected <br />alternative.
The URL can be used to link to this page
Your browser does not support the video tag.