Laserfiche WebLink
mmm"mm <br />^r^'^c- <br /><r\ - ■'V <br />H-i7. <br />V • <br />Bi4TVV*^* <br />;:%■?« <br />HENNEPIN <br />DEPARTMENfr OF PUBUC WORKS <br />Engineering Division <br />320 Washington Ave. South <br />Hopkins, Minnesota 55343-8468 <br />Phone:(612)935-3381 <br />February 27, 1990 <br />mm <br />A/.'. > <br />Ms. Jeanne Mabusth <br />Building and Zoning Administrator <br />City of Orono <br />P. 0. Box 66 <br />Crystal Bay. MN 55323 <br />Dear Ms. Mabusth: <br />RE: Proposed Subdivision - Rodney Johnson <br />CSAH 6, North side, approximately 750 feet east of TH 12 <br />Section 29/32, Township 118, Range 23 <br />Hennepin County No. 1811 <br />Review and Recommendations <br />.1 <br />We reviewed the above subdivision and make the following comments: <br />r :• <br />- For future Improvements to CSAH 6 the developer should dedicate an additional 17 <br />feet of right of way along CSAH 6 making the right of way 50 feet from the <br />center of CSAH 6. <br />- Any access from this parcel to CSAH 6 will require an approved Hennepin County <br />entrance permit before beginning any construction. Contact our Operations <br />Division for entrance permit forms.to m <br />- All proposed construction within County right of way requires an approved <br />utility permit prior to beginning construction. This Includes, but Is not <br />limited to, drainage and utility construction, trail development, and <br />landscaping. Contact our Operations Division for utility permit forms. <br />- The developer must restore all areas disturbed during construction within County <br />Ms <br />■mkM <br />1^ right of way <br />Please direct any response or questions to Les Weigelt. <br />Sincerely, ^ <br />^ <br />Dennis L. Hansen, P.E. <br />Transportation Planning Engineer <br />8mmmmm <br />LH/L0W:lw <br />hm <br />■:r ■ <br />wmmmM <br />i <br />'-Jv <br />i».-VV;3!:-'2 T- • <br />"V . <br />HENNEPIN COUNTY <br />an equal opportunity employer