Laserfiche WebLink
MS-3131 <br />Jnly 13.2005 <br />Page 4 <br />exploring with MCWD (Orono’s LGU for WCA regulations) whether this fill/miligation will be <br />possible. Under Orono’spending wetland ordinance revisions, if the wetland basin is between 2,5 <br />and 5 acres as anticipated, the City would require a 25* buffer and additional 20* buffer setback <br />for structures from the wetland, which would have potential significant impacts on house <br />placement and buildabilityfor Lots 8-9-10-11. Staff is also concerned about the location of homes <br />so near the proposed stormwater ponding on Lots 10 and 1 1 . <br />E. Stormwater and Drainage Improvements and/or Easements Needed <br />The proposed development is required to provide stormwater management systems including <br />ponding. Easements for the natural drainageway skirting the south end of the site will be required. <br />The entire property including wetlands and the Williamson residence lot will be subject to the Storm <br />Water and Drainage Trunk Fee established for 2005 as S4,l 60 per acre for the V2 acre zone; no fee <br />has been established for SFR at 2-3 units per acre, but we would expect the above rate to be in the <br />ballpark for the proposed development. )^ether the church parcel, Lot 3, should be exempt from <br />the SW&DT Fee is an item for fUrther discussion. <br />F. Wetlands and Ponds: Outlet vs. Individual Easements <br />If this site is developed via the RPUD standards, and depending on whether the road becomes public <br />or private, it may to most appropriate to place the wetlands and ponds into a commonly owned <br />outlot. This would have a definite impact on the gross lot area for Lots 9-10-11 , which severely <br />impacted by the proximity of proposed homes to the ponds and wetlands... <br />G. Lot Layout and Lot Standards (RPUD) <br />At the sketch plan review, Platming Commission concluded that the RPUD standards for SFR <br />development are generally appropriate for this site, with a few minor revisions. The RPUD <br />standards [Section 78-626(8)] are summarized as follows: <br />-15,000 sf min. dry buildable lot area (PC indicated 14,000 sf min. was acceptable) <br />- SK)' minimum lot width at the setback line (all 9 new lots meet this using a 30* street <br />setback...) <br />- 125* minimum lot dqith (all but Lots 2,4 and 5 meet this vriien measured fiom the new <br />road to the midpoint of the opposite lot line; Lot 2’s short side along Willow is <br />technically a firont yard, although the narrowness of the lot and the requirement for <br />access to tihe new road rather than Willow force the south side to function as fix>nt <br />yard, with functional lot depth of 75*-95*, and leaves only a minimally functional <br />rear yard... Lots 4 and 5 stiU have reasonably functional fiont and rear yards...) <br />- 40* rear yard or 20% of lot depth, whichever is less (Lots 2 and 6 don’t meet this <br />standard but won’t be much affected if it it is required) <br />- 25' front setback on internal streets (30 ’ was used on the plat, which allows the lots to <br />meet the 90 ’ lot width standard...)