My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2005 Council Packet
Orono
>
City Council
>
2005
>
12-12-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 2:21:47 PM
Creation date
1/12/2023 1:59:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br />^1 <br />James Fill Request <br />November 23,2005 <br />Page 2 <br />Ames requests special approval to commence Step 1 prior to completion of the CUP review <br />process. Ames would like to be moving fill material onto the site (Step 2) in late January, and <br />the topsoil must be removed prior to bringing in fill. Tl. earliest possible CUP approval would <br />be at the City Council on January 23. <br />The property owner and a Todd Planting of Ames have met with staff, and an application for the <br />land alteration CUP was submitted on November 23. Ames is requesting that staff be authorized <br />to issue a land alteration permit prior to the CUP approval to allow stripping and stockpiling of <br />topsoil. In order for this to occur, the applicant will need to submit to the City for staff & <br />engineer review a detailed plan indicating temporary fill placement and stockpile areas, and <br />provide a stormwater management and erosion control plan. An MCWD erosion control permit <br />will be required. <br />Note that the plan submitted on 11/23 shows perimeter berms at a height of approximately 4 feet. <br />It also indicates a “No Fill in Wetland ” area that appears to not include the entire wetland. This <br />”No Fill” area will have to be revised, and staff would expect a much more detailed plan by a <br />surveyor/engineer with survey work defining the delineated wetland boundary and required <br />buffers, prior to issuing the initial topsoil stripping permit. <br />Staff Recommendation <br />Due to the existence of wetlands on the property, and because there is no set development plan <br />for the site, care will have to be taken with respect to erosion control, wetland protection, and <br />fimshed appearance of the stockpiles, as we have no indication how soon actual development of <br />the property will occur. However, the benefits of the owner acquiring fill when it is available <br />immediately adjacent to the site, are compelling. <br />Staff recommends approval of a staff-issued land alteration permit for the topsoil removal and <br />stockpiling, subject to the following being submitted and approved by City Engineer prior to <br />issuance of this initial permit: <br />1) Complete application for CUP. <br />2) Detailed plan indicating temporary fill placement and stockpile areas. <br />3) Detailed Stormwater Pollution Prevention Plan (SWPPP) - required because more than one <br />acre of land is being disturbed. <br />4) MCWD mosion control permit and stormwater plan approval. <br />COUNCIL ACTION REQUESTED <br />Authorize staff to issue land alteration permit subject to staff recommendation and the process <br />^ :ribed above.• -s' <br />mUlaaaiii
The URL can be used to link to this page
Your browser does not support the video tag.