My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-2005 Council Packet
Orono
>
City Council
>
2005
>
12-12-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 2:21:47 PM
Creation date
1/12/2023 1:59:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■• V /*> "" <br />r.V‘. ^ ■ ■ ■i-m: <br />•..f.-lV <br />-.VV: •' •.- <br />ZONING APPUCATIOWSICONT.^ <br />Anplkattoii Type <br />SPECIAL IMPROVEMENTS <br />Non-refuiidablc charget for City Enginccr'a review for applicatioiis aad <br />design drawing, including consiruction inspection fees. If improvements <br />are proposed as part of a Subdivision, Review Charges arc payable with <br />Preliminary Plat application. <br />Proposed Private Roads <br />Proposed Public Roads <br />Request for City to accept ciisting private road <br />Request for City to nmintain unimproved public road <br />Proposed Sanitary Sewer Main Eitension <br />Proposed Watermain Estension <br />Proposed Storm Sewer System (eaduding culverts) <br />On-Site System - Site Evaluation Review <br />(applicable to rural subdivision applications) <br />RIP-RAP <br />Staff Review (normal rip-rap) <br />Unusual Rip-Rap: a) New installation <br />b) Repair previously approved <br />APPEAL OF ADMINISTRATIVE DECISION <br />INDUSTRIAL REVENUE BOND APPLICATIONS <br />Minimum Project Valuation: S2SO,OOO.M <br />Appiicalion Fee: <br />a <br />51 •. >' ’ <br />m'imm <br />■ <■ <br />■ -i- ^ ‘r’. <br />Applicable <br />Code Section <br />Sec. 82-213 (4) <br />S6S0.00 plus 504/lineal foot <br />$950.00 plus SiW/lineal foot <br />$950.00 <br />$225.00 <br />$275.00 plus $25.00 per stub <br />$275.00 plus $25.00 per stub <br />$250JM <br />$ 60.00 per new lot proposed <br />for on-site <br />No Charge (MCWD Permit Required) <br />$100.00 CUP review <br />Staff permit “ $100.00 <br />$100.00 See. 78-99 <br />0.1% of project valuation <br />($250JO ndnimum) plus <br />55J00.00 deposit for IcgaV <br />administrative cipcnscs <br />2006 Fee Schedule-Page 4 <br />I iftfAwniiiWiiiiat
The URL can be used to link to this page
Your browser does not support the video tag.