Laserfiche WebLink
SIWER PROJECTS <br />20QS-1 WAher Hilh/S Rroww M Put <br />20M.2 niA«^ f r>T N <br />l2oiL£taiESL± <br />200S <br />Ana otAcfcCInc Credit to Area <br />SI0.000.00 <br />S12.000LOO <br />0) <br />(1) <br />1M4 PwrcMiMla and Lift Statton #7 <br />Exifltiai PtopettiN/Increase <br />New Bld|e Repbcing Exiiting Bldgs <br />New Residential w/Existing Stub <br />New Residential without Soib <br />Freshwater Biological (Incl. *Mar»ti at Ubyette' Lots) <br />fftJYllft-t <br />iMsoota)S560.oon) <br />tJ4»,OO ffiS560.00n) <br />#7 Forcctnaln <br />td0J.Q 0S625.00 <br />t6Qt.OOS625.00 <br />ttJ30.Q QSl.785.00 <br />UJ3QJ QS1.785.00^4) <br />t680.OOS700.00 (4) <br />Credit to Area <br />(*) <br />(4> <br />(4) <br />(1) and (4) <br />(l)and(4) <br />IMP Gravity Line and Lift Station <br />(see map for affbcted areu) <br />Fixed Charge *■ <br />S225.00 <br />»10 Bv Pass <br />t3JtQJO S3.145 00 <br />Credit to Area <br />(1) <br />WATER PROJECTS <br />By District • Project <br />1967 LW'l Highway 12/Ciysai Bay Road <br />1969 LW-2 Chevy chase <br />1970 LW>1 Navarre Residential <br />1970 LW*1 Navarre Conanercial <br />19S2-1A Nav arro <br />1989 Highway 12 <br />1999 Navarro Water Treatment Plant <br />Rehabilitation <br />Unit Charoe +Area/Acreace Front Foot Credit to Area <br />ttJOtJO S5.255.00 <br />ttO0tJQ S5.255.00 <br />t3.t3 0J Q S2.600.00 <br />t3JOOJO S3.905.00 <br />ta^dOOJO <br />ttttJO S430.00 <br />t3?J4 S39.01 (1) <br />(1) <br />•tatat S25.99 (I) <br />t3?J0 S39.07 (1) <br />(1) <br />t0JttQQ .S0.64S.0O/acre (I) <br />(1) <br />PUBUC WORKS DEPARTMENT MISCELLANEOUS CHARGES <br />MUNICIPAL SEWER RATES by unit; <br />1st <br />2nd <br />by flow: <br />municipal water rates <br />NavaireArea <br />Billing R Reedy to Serve Chg <br />Water Usage Rate <br />Unconnected Property Chg <br />Highway 12 Area <br />Billing R Resdy to Serve Chg <br />Water Usage Rate <br />Chevy Chase Ares <br />BillifiA A Rcidy to Scn'c Cngi <br />Water Uage Rate <br />Bulk sale to Minnetonloi Beach for Lsftyene Ridge <br />Ares <br />lOQSFee <br />88 5 .00 pee quartet <br />t 3.54/1000 gaUoB plus <br />8 8 i8 5 pee ^waiter per <br />eonneetion <br />8 26.8 5/^ <br />t 2.27/1000 gal <br />t 3 6.8 5/^ <br />8 0.75/y <br />8 3.15/10 00 gal <br />8 0.75/^lr <br />13i3 6/1000 gal fno ahanga) <br />t3 6.8 5i<^te billing eharge plus <br />t3.27/iOOO gallew total flow at <br />2006 Fee <br />S96.55 per Quarter <br />S87.3S per quarter <br />S 3.64/1000 gallon plus <br />S 9.10 per quarter per <br />connection <br />L2L5i/qtr <br />S 2.33/1000 gal <br />S 27.5S/qtr <br />SlO.OO/Qtr <br />S 3.24/1000 gal <br />SlO.OO’Qtr <br />I2i2/1000gal <br />S27.55 qtr billing charge plus <br />S2.33 M00O gallon total flow at <br />border meter <br />Page 3 of 4