My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2005 Council Packet
Orono
>
City Council
>
2005
>
11-14-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 1:04:30 PM
Creation date
1/12/2023 12:49:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item <br />PART 1 • 200.000 OALLON ELEVATED <br />RESERVOIR: <br />1 MOBILIZATION <br />2 EXTERIOR CLEANING. SURFACE <br />PREPARATION, DISPOSAL. AND PAINTING <br />(EXCLUDES CITY NAME SCHEME) <br />3 INTERIOR WET CLEANING. SURFACE <br />PREPARATION. DISPOSAL. AND PAINTING <br />4 STRUCTURAL REPAIRS AND MODIFICATIONS <br />5 WELDING AND GRINDING OF ERECTION <br />BRACKET SCAB MARKS AND WELD SPATTER <br />6 FUa NEGATIVE-AIR CONTAINMENT <br />7 CATHODIC PROTECTION <br />8 8’ HIGH CHAIN LINK FENCE <br />TOTAL PART 1 - 200,000 GALLON ELEVATED <br />RESERVOIR: <br />alternate 1 ♦ PAINT APPLICATION OF <br />CITY NAMES: <br />0 PAINTING CITY NAME SCHEME (ADO) <br />TOTAL ALTERNATE 1 - PAINT APPUCATION <br />OF CITY NAMES: <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 4000 00 1 $4,000.00 <br />LS 1 49500 00 1 $49,500.00 <br />LS 1 40260.00 1 $40.260 00 <br />LS 1 31576.00 1 $31,576.00 <br />HR 125 75.00 125 $9.37500 <br />LS 1 45000.00 1 $45,000.00 <br />LS 1 12740.00 1 $12,740.00 <br />LF 154 70.00 154 $10.780 00 <br />$203,231.00 <br />1 4000 00 S4.000.00 <br />$4,000.00 <br />NANOEO <br />1 <br />M0.1 <br />Add m 12 inch by 18 inch vent hatch In bottom of <br />tank bowl for aoceaa and ventilation during <br />painting. TWa work not change the contract <br />completion date. <br />TOTAL CHANOC ORDER NO. 1 <br />TOTAL PART 1 - 200.000 GALLON ELEVATED <br />RESERVOIR) <br />TOTAL ALTERNATE 1 - PAINT APPLICATION <br />TOTAL CHANGE ORDER NO. 1 <br />TOTAL WORK COMPLETED TO DATE <br />1 2500.00 S2.500.00 <br />$2,500.00 <br />$203,231.00 <br />$4,000.00 <br />$2,500 00 <br />$209,731.00
The URL can be used to link to this page
Your browser does not support the video tag.