My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2005 Council Packet
Orono
>
City Council
>
2005
>
10-10-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 12:30:30 PM
Creation date
1/12/2023 11:55:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />incorporation into the engineering drawings the minor engineering matters discussed <br />within foe same letter. <br />2. A revised set of building elevations illustrating like building materials and colors on <br />all fa9ades. <br />C. Final Submittals <br />1. Record plat drawings in the form of two (2) mylar copies (one copy for the City’s <br />records and one for filing with Hennepin County) and one (t) copy reduced to a 1” « <br />200’ scale. Drawing to include: <br />A. Lot lines platted per preliminary plat survey/drawing approved on March 28, <br />2005. <br />B. Dedication of “drainage and utility easements ” over Lot 11 (the common lot). <br />C. Naming of the plat. <br />2. Legal documents required: <br />A. Title opinion addressed to the City or a title insurance policy in favor of the <br />City. All owners, mortgage holders or others with property interest indicated <br />therein shall sign the plat and all other documents affected by such interest. <br />B. The applicant must provide certified copies of all recorded easements <br />currently affecting the property. <br />C. Signed PUD/Developers Agreement (draft will be forwarded to you within <br />the next few days) and a Letter of Credit in the amount of $822,848.63. <br />3. Plat approval fees to be paid: Total due: $18,079.00 <br />A. Final plat fee = $280.00, <br />B. Legal review & filing fees for subdivision and associated documents: <br />$250.00, <br />C. Stormwater and Drainage Trunk Fee: $17,549.00, and <br />D. Additional engineering and legal fees will be billed at actual cost as they are <br />incurred. <br />The documents necessary for final approval, PUD & Developer ’s Agreement and Resolution, <br />will not be approved by the City Council until the items listed above have been submitted and <br />accepted by City staff. The fees will be required prior to filing of the plat and before any <br />building permits or site work permits will be issued. I’ve attached all necessary documents <br />regarding the issues noted above for your review. Please contact me or Planning Director <br />Mike Gafiron if you have further questions. <br />Sincerely, <br />City of Orono <br />Janice Gundlach <br />City Planner <br />cc. Mike Gaffron, Planning Director <br />Dan Larson, Loucks Associates
The URL can be used to link to this page
Your browser does not support the video tag.