My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2005 Council Packet
Orono
>
City Council
>
2005
>
10-10-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 12:30:30 PM
Creation date
1/12/2023 11:55:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/12/2023 12:30 PM
Modified:
1/12/2023 12:30 PM
Text:
mailto:bryce.fossand6dot.state.mn.us
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U <br />Mik« Oaffron <br />From: <br />S«nt: <br />To: <br />Sul^oct: <br />Hoff, Lance R. phoffObonestroo.coiTi] <br />Thursday. October 06,2005 5:07 PM <br />Mike Gaf^ <br />FW: Brown Road Pond -Amber Woods • Orono <br />Mike, <br />I'm forwarding the email from MNDOT giving pre-approval for the use of the Brown Road pond <br />by the Amber Woods development. We've directed Loucks to replace the StormTech system <br />with RCP and submit revised plans and calcs to us for review (sometime tomorrow). We're <br />also requiring that they provide additional excavation in the MNDOT pond to meet NURP <br />standards to which they have preliminarily agreed. I will keep you Informed as things <br />progress tomorrow. Please don't hesitate to call if you have any questions! <br />Lance Hoff, P.E. <br />Bonestroo. Rosene, Anderllk, & Associates <br />(651) 604-4755 <br />- - -Original Message- - - <br />From: Bryce Fossand [mailto:bryce.fossand6dot.state.mn.us] <br />Sent: Thursday, October 06, 2005 1:58 PM <br />To: Hoff, Lance R. <br />Cc: Martin Korthank <br />Subject: Brown Road Pond -Amber Woods - Orono <br />Lance, <br />I've reviewed your calculations and HydroCAD model for the Brown Road pond. Everything <br />looks good. Based on this irformaticn, we will approve the permit after we receive the <br />updated Amber Woods design information and drainage plans from Loucks Associates. This <br />likely would not change our approval for the drainage portion of the permit. Your analysis <br />included this as a developed area in your model and the pond handles this to our <br />satisfaction. However, we do need the Loucks information for our records. This as well <br />as the plans for water quality related dredgeing of the pond will have to be routed <br />through permits for approval. At this point, you can consider this a pre-approval for the <br />drainage permit. If you have any questions please call. Thanks. <br />Bryce <br />Bryce Fossand <br />Mn/OOT Water Resources Engineering <br />1500 Nest County Road B2 <br />Roseville, MN 55113 <br />Office: 651-634-2408 <br />Bryce.FossandSdot.state.mn.us <br />: % <br />dl-- •
The URL can be used to link to this page
Your browser does not support the video tag.