My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2005 Council Packet
Orono
>
City Council
>
2005
>
07-11-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 10:24:49 AM
Creation date
1/12/2023 9:37:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m <br />' . ,: '!.i ■ , " •< <br />:'i 5 .;i <br />'! ■ :• • <br />■'.. •••'•.L' y. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />The developer shall grant to the City 10 foot drainage and utility <br />easements along perimeter property boundaries and 5 foot drainage and <br />utility easements along all interior property boundaries. <br />Payment of standard Park Dedication Fee for Lots I -5. <br />Pa3mient of standard storm water and drainage trunk fee for the entire <br />property. <br />No land alterations shall take place until erosion control is established and <br />the City Engineer has approv^ all final improvement plans. No building <br />permits will be issues until all drainage facilities, improvements, and <br />satisfactory road base (base layer and initial lift of bituminous) have been <br />installed. <br />The two existing accesses onto Fox Street (existing main house driveway <br />at west end of site and guest house driveway) shall be eliminated at the <br />time the base layer and initial lift of bituminous are completed for the <br />proposed private roadway. The paved portion of the private road shall be <br />24* with a 50* diameter cul-de-sac. <br />Front and street yard setback variances shall be granted to allow the guest <br />house to remain in its current location until the time the main house is <br />demolished and/or the lot is redeveloped. <br />The driveway off Fox Street serving the guest house shall be removed in <br />accordance with condition #4 above, and re-routed to access only the main <br />house driveway. <br />Proposed lot 6 shall be consideied a back-lot for zoning purposes <br />requiring 150% of the zoning district setback requirements. <br />The bluff depiction on the plans dated January 29, 2004 and revised May <br />4,2005 is incorrect and shall not be used in determining the required bluff <br />setbacks for new construction on lot 6. The location of the existing house <br />is grandfathered in. <br />Installation of a conforming 7-bcdroom septic system serving the main <br />house and the guest house shall be completed within 1 year of the filing of <br />Page 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.