Laserfiche WebLink
... <br />r % Vv* v. .. -J: <br />K 9 <br />i <br />Traffic Control Signal Pre-agreement Information <br />T.H. 12 e CSAH 6 (6 “’ Ave. N.) Ramp Signals <br />April 2S, 2005 Page 2 <br />CQgt ParticiDation: It is anticipated that this project will utilize federal, state, local and/or <br />state aid funds. Cost percentages are based on the percentage of legs controlled by <br />each roadway authority and are also affected by Hennepin County policy. <br />Mn/DOT assumes 100% of the cost responsibilities for the signal design. <br />Cost responsibilities for the signal system pay items are as follows: <br />Signal Loc. & Pav Item Est. Total Agency <br />TH 12 @ CSAH 6 N Ramp/ $220,000* Mn/DOT <br />New Traffic Control Signal <br />(5 contributing legs; 3 Mn/DOT. 2 Co.) <br />*tncludes interconnect <br />Agency Est. %Est. Share <br />Mn/DOT 12%$26,400 <br />Federal 48%$105,600 <br />Henn. Co.20%$44,000 <br />Orono 20%$44,000inuiuuM iiueiv^wiiiicwi ^ - .----- <br />Note: Hennepin County policy delegates half of the county costs to the City of Orono. <br />TH 12 @ CSAH 6 S Ramp $160,000 Mn/DOT <br />New Traffic Control Signal <br />(4 contributing legs: 2 Mn/DOT, 2 Co.) <br />Mn/DOT 10%$16,000 <br />Federal 40%$64,000 <br />Henn. Co.37.5%$60,000 <br />Orono 12.5%$20,000 <br />Note: Hennepin County policy delegates 1/4 of the county costs to the City of Orono <br />(reduced from % due to the existing signal) <br />The city & county shall reimburse Mn/DOT for State furnished materiais/labor (cabinet, <br />controller, etc.) at the same cost percentage rate as the corresponding signal pay item. <br />Costs for State furnished items will be included in the signal agreement and will be in <br />addition tothe signal pay item costs listed above. Estimated costs for known state furnished <br />items (other items may be added during design): two Cabinets/controllers = $20,200 each <br />and one Master Controller=$6.200 (loc. at the N. ramp. Note; county to pay 40% for master). <br />The city & county will also pay a factor of 8% within the signal agreement, which will be <br />applied to the sum of the local share of the signal pay item and state furnished material <br />costs (multiply by 1.08). to account for construction engineering and inspection costs <br />(E/I). <br />The total signal costs for the local shares are calculated below; <br />((Sum of; Local Cost % (pay item + State Furnished materials)] X (cost of E/l) = Total <br />Hennepin County Share: <br />(.2 ($220,000 + $20,200) + .4($6,200) + .375($:60.000 + $20,200)) 1.08 = $127,543 <br />% N. Ramp Cabinet % Master % S. Ramp Cabinet E/l <br />Orono Share: <br />(.2 ($220,000 + $20,200) + .125($160.000 + $20,200)] 1.08 = $76,210 <br />% N. Ramp Cabinet % S. Ramp Cabinet E/l <br />Note The city and county must indicate whether they are eligible for, and intend to <br />use, state aid funds toward all or part of their costs. Please provide an S A.P. <br />and/or local agency plan number as soon as possible. The project numbers <br />provided will be ii. Jleated on the plan <br />I