Laserfiche WebLink
I <br />DATE: J«ic 22,2005 <br />ITEM NO: jtj <br />REQUEST FOR COUNCIL ACTION <br />••CCTIMG <br />JUN 2 7 2005 <br />CITY OF ORONO <br />DcpartBcit Approval: <br />Nsm Ronald J. Moona <br />THh City Administrator <br />AdmiabtratoiLRcviewed:Agenda Section: <br />City Administrator’s Report <br />Item Description Mn/DOT Traffic Signal A£i«enient for the 6/12 Interchange <br />The two intersections on the planned interchange at County Road 6 and Highway 12 will both be <br />signalized. The installation costs for these signals are shared between Mn/DOT, Hennepin <br />County, and Orono, based on the cost-sharing policies of both Mn/DOT and Hennepin County. <br />The costs related to the operation of the signals are the responsibility of Orono. <br />Attached is a letter describing the signals, and setting out the cost sharing related to both the <br />insullation and maintenance of the signals. Orono will pay approximately 16% of the <br />installation costs. Orono’s costs will be $76,210. This amount can be paid using MSA funds. <br />If the various elements set out in the letter are acceptable to the City and to Hennepin County, a <br />signal agreement will be prepared for signature by all parties. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve the elements of the cost sharing agreement as set out in the letter of April 25, <br />2005, and to authorize the Mayor and City Administrator to sign the final agreement that will <br />reflect the information in the letter. <br />I*" <br />"i.: <br />y-':yV. <br />,y. -y: ■■ <br />Lati miiilHiiti. 111. Ill ■ ■ i rm <br />1 <br />j