Laserfiche WebLink
I <br />J^Bonestroo <br />g-gWosene <br />vSAnderlH(& <br />Associa te s <br />Engitwers 4 Archllects <br />2335 West Highway 36 • St. Paul. MN 55113 <br />Office: 651-636-4600 • Fax: 65F636-I3H <br />wwwJjonestrooxom <br />April 7.2005 <br />Ms. Janice Oundlach <br />Planner <br />City ofOrono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />Re:ll46WildhuntTniil <br />Pile No. 139-05-000 <br />Plat No. 05-3100 <br />Dear Janice: <br />We have reviewed the site plans for the proposed improvements to 1146 Wildhurst Trail. The site improvements include <br />the removal of an existing house and boat house, the construction of a new house and detached garage along with the <br />associated site grading. We have the following comments with regards to engineering matters: <br />There is an existing city owned sanitary force main located along the north side of the boat house. Removal of <br />the boat house and the associated site i^ing to restore the slope could impact the existing sanitary sewer. The <br />sewsr should be shown on the plans and a note included with die plans stating that this sewer must be protected <br />during any construction activities. A city public works official should be on site when any removal or grading <br />activity occurs near this sanitary sewer. <br />The city should verify that a drainage aitd utility easement exists over the sanitary sewer. If one does not exist <br />the applicant should provide an easement 20-feet wide centered over the sewer. <br />The grading plan shows proposed swales between the house and the side lot lines. Construction of the swale <br />along the east lot line is proposed within a 5-fbot wide corridor between the proposed retaining walls and the <br />east lot line. It will be difficult if not impouible to construct this swale within the 5-foot corridor provided. We <br />recommend that at least 10-feet be provided for swale construction. A revised grading plan showing at least a <br />10-foot wide clear area in the side yards for swale coiutruction should be submitted for review and approval. <br />A drainage area map and drainage calculations should be provided with the revised grading plan. The drainage <br />calculations should include computationa that verify the proposed swales will contain runoff on the subject <br />property for storma up to and including the lOO-year storm event <br />The retainirig wall shown lake ward from the home approaches 10-feet in height All retaining walls that exceed <br />4-fbet in height require a separat e engineered design and detail submittal. <br />Erosion control measures should be installed, inspected and approved by the city prior to any work on site. <br />If you have any questions please call me at (651) 604-4863. <br />Yours very truly. <br />BONESTROO, ROSENE, ANDERLIK A ASSOQATES, INC. <br />Tom Kellogg <br />Cc: OregOappa,City ofOrono <br />• St. Paul. St. Cloud. Rochester. Wlllmar. MN • Milwaukee. Wl • Chicago. IL <br />AtnfUw ntWn/«SM*t oaawtwnrty