Laserfiche WebLink
r <br />1 ■/■'■^ <br />: ..'.■T <br />L„ <br />SoncstrooH; <br />vl AndcfMcCi <br />|\|| Anodaies <br />fngkwiri4MiiMcU <br />Ptoi«rti4MTw:mi2 84nlt>nrStfHyPIP>Bii^ <br />deni Pfoied No.; _________________ <br />Bid Ooemno: Thundey. Met 20^ 2005 eM1:00 AM <br />File No. <br />Owiwr: <br />000139-<m52-0 <br />I tmt*by<Mftlfy that this iztn exact <br />npmducton afbUt neamd. <br />CNvotOrano CtAfW2^ <br />sR.JansU.Pe <br />No. 14S96 <br />MDTMUUnON <br />■MdwNo.2 <br />rinti.lno <br />aM*rNo.3 <br />rmidar PlpaliM U.C <br />BkMwNo.4 <br />OM Comracdns Inc <br />ConMnidlon hmovaliom <br />Inc <br />UnNs <br />BASE MD: <br />1 MOBILIZATION <br />2 MACHNC8UC8I SILT FENGS <br />a ir MOPE PIPS INSTAOED BY <br />BURSTINQ METHOD <br />4 RECONNECTION OF EMBTING SERVICS <br />C0NNECTI0N8 <br />5 SITE RESTORATION <br />total BABE MO <br />LB <br />LF <br />1 <br />100 <br />EA <br />LS <br />415 <br />2 <br />1 <br />ALTERNATE MO NO. 1: <br />REMOVE EQUMMENT FROM RELIEVER <br />LIFT STATION AFTER USE AND <br />SALVAGE Aa ECMPMENT TO CITY <br />TOTAL ALTERNATE MD NO. 1 <br />UnN Price Total <br />S3.000.00 <br />UM <br />< « 'I* IS3 <br />S400.00 <br />196.00 S39.840.00 <br />S1.000.00 <br />S2.SOO.00 <br />S2.000M <br />S2.SOODO <br />S47.740J0 <br />S2.500.Q0 $2M0m <br />M^OO <br />Puih,liic <br />22M/2NMamSt <br />Rice Late. Wl 94860 <br />(7191236-7874 <br />(719)238-7434 <br />Signed Bf. J8CA Ljpcaield <br />adSaoufllrBUBond <br />One <br />UnW Price Total <br />S2.900.00 <br />%^4M <br />52.900.00 <br />51.400.00 <br />S80.00 S36.935.00 <br />52.500.00 <br />59.790.00 <br />S9/)00.00 <br />SO.790.00 <br />S9S.S89.00 <br />S9.900.00 S5.500.00 <br />S9.S00.00 <br />Engmenng 6 Conetrudion <br />IrmovaOofB Inc <br />1334WldwoodRd <br />StCIOud.MN 56303 <br />(320)296>9111 <br />(651)296-0113 <br />RobbJolvieon <br />Bid Bond <br />One <br />UnE Price Total <br />SO.949.00 <br />S3.00 <br />S8.040.00 <br />S300.00 <br />S190.00 $62,250.00 <br />S2.500.00 <br />S1.000.00 <br />55.000. 00 <br />51.000. 00 <br />sn^.00 <br />S2.7SO.00 S2T50 00 <br />S2.790.00 <br />Frontier Pipeline LLC <br />1770 14401 31 <br />NewRichffiond.W1 54017 <br />(612)802-8962 <br />(715)246-3009 <br />DewN S. DaBargeon <br />Managmg MemOer <br />Bid Bond <br />One <br />Untt Price Total <br />S3.500.00 <br />S3.10 <br />S3.500.00 <br />S310.00 <br />$145.62 S60.432.30 <br />$4,534.72 <br />S12.349.00 <br />S9.069.44 <br />S12.349.00 <br />S85J80.74 <br />S13.001.72 S13.001.72 <br />$13^1.72 <br />GM Contracting Inc <br />19610 51501 Avc <br />LakaCiyslaLMN 56055 <br />(507)726^33 <br />(907)726^399 <br />Henry Haraan <br />Bid Bond <br />One <br />s n.- <br />JaMLa