;■ -f <br />f ! <br />(4) location ofburied fiibric used for soil stabilization, and (5) location stationing and swing tiesofall utility <br />connection lines and cleanouts.. <br />4. Iron Monuments. Before the security for the completion of utilities is released, all <br />monument8mu8tbecorrectlyplacedindiegiroundinaccordancewithMinn.Stat.§50S.02,Subd. I. The <br />Developer's surveyor shall submit a written notice to the City certifying that the monuments have been <br />installed. <br />5. Rightrrf'Entry. TheDeveloperhereby grants the City, its agents, employees, officers and <br />contractors the right to enter the Property to perform all woiic and inspections deemed appropriate by the <br />Cify in conjunction with Property development, including but not limited to constructing or completing any <br />and all of the agreed upon hnprovements should the Developer not complete those Improvements by the <br />date specified herein. <br />6. StteErosloaControL Priortoanyroughgrading,priortoutilityconstmction,andprior <br />to issuance ofbuilding permits, the Develqrer shall obtain the necessary erosion control permit fixwn the <br />Minndiaha Creek Watershed District, and the approved erosion control plan. Plan B, shall be <br />implemented, inspected, and qiproved by the City. The City may impose additional erosion control <br />requirements if they would be beneficial. All areas disturbed by the excavation and backfi lling operations <br />shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided <br />in the erosion control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as <br />possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. <br />The parties recognize that time is of foe essence in controlling erosion. If the Developer does not comply <br />with foe erosion control plan and schedule ofsupplementary instmetions received fiom the City, the City <br />may take such action as it deems qrpropriate to control erosion at the Developer's expense. The City will <br />endeavor to notify foe Developer in advance of any proposed action, but failure of foe City to do so will <br />not afiect foe Devekpet'k and City's rights or obligations hereundo ’. No development will be allowed and <br />no building permits will be issued unless foe Property is in full compliance with the erosion control <br />requirements. Erosioncontrol needs to be maintained until vegetative cover has been restored, even if <br />constnictionhasbeencoiiqrleted andaccqrted. Afterfoe site has been stabilized to where, in theopinion <br />of the City, foete is no longer a need fiir oosion control, the City will aufoorize foe removal of the erosion <br />control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion control <br />measures. The Letter of Credit required by this Agreement shall include coverage for erosion control. <br />7. Cleanup. The Developershall maintain aneat and orderiywork site and shall daily clean, <br />on and offsite, dirt and ddrris, includingblowables, fiom streets and the surtoundingarea that has resulted <br />fipom construction work by the Develops, its agents or assigns. <br />8. Acceptance and €)wnersliip of Improvements. Upon completion and acceptance by <br />the City of foe work and construction required by this Contract, any improvements lying within public <br />easements shall become City property. Aftor completion of the improvements, a representative of the <br />contractor, and a representative offoe Developer's engineer will make a final inspection of foe work with <br />the City Engineer. Before the City accepts foe improvements, the City Engineer shall be satisfied that all <br />GC-2