My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-2005 Council Packet
Orono
>
City Council
>
2005
>
04-25-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 4:15:00 PM
Creation date
1/11/2023 3:42:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22. <br />23. <br />24. <br />hive a bronze modized finish. Install a new aluminum clad stonn door on n§ <br />door. I have included a $300.00 nulerial allowance for this item <br />Infill small double hung window opening at East wall of existing <br />Windows on West, Norfii and Soudi walls to be cottage styl^^dduble hung windows. <br />Windows to remain in same location. <br />Window on East wall of ouster bedroom to be a cps^i^t window to meet egress codes. <br />Frame new tough openings for two new sin^'i)^^ casement windows in kitchen, <br />bsuhna and caulk around exterior and required for a weather tight seal . <br />RqMir plaster, sbeetrock or wood papelmg around windows as requited. Some of the <br />wood panning nuy not be matched. <br />Supply and install a paint mde S/8** x 3 1 /2" wide flat casing, with two eased edges, on <br />thetwoaidesofthei^Bflw,a%**x5 14** top piece with a %**x 1 ** top ciq>. A sill <br />extenskm will bejaddra die existing window sill provided 1^ Loewen windows and will <br />be apptonnpMfy V a ” x I W* paint grade material. The wiiKlow apron will be x 3 W* <br />point md^material. <br />Claafi^ and diqjxioe of all ddxis generated by Hunetberg Construction Company. <br />Prating of interior of windows completed under each room break down. <br />Deck EXHIBIT H <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />Refocate double headed spot light as required for new deck. Air conditioner condenser is <br />to remain in same locatioiL If it is required to be moved, diis would be an additional cost <br />Remove aiding as required fa Installation ofrequiredd^ flashing fiir a new 12* x 14* <br />deck. <br />The footings will be 12** diameter x 42** deqi concrete, formed with sonotubes. <br />The fiaming will be 2 X10 treated joists 16** on center. Joists will besupportedby 6x6 <br />amootfi cedar posts on a double 2 X10 treated header bolted to the posts. We will puts 1 <br />V4** X Vt" mpmn trim bond around the top and bottom of die two cefa 6x6 posts. <br />Ihave included a H**x 11 %**smoodi cedar fiwcia to cover iq> die fine of the treated rim <br />joists. <br />Deddng to be a 5/4** x 6** Mangaris brand, run perpendicular with the joists. Decking will <br />be finlened to joists with special screws designed fa K^mgaris decking. Cut edges of <br />decking to be sealed per manufiwturers recommendations. <br />The tailing will be a Deckontofs brand widi a stiai^ cedar top and bottom rail. Spindles <br />will be steel. Railing height will be between 36** and 40** to meet building codes. There <br />can be no more than a 4** qwce between any part of the railing^. <br />Posts fa tailing to be 4** x 4** smoodi cedar, no more than 8* -0 apart <br />I have included one 3*-0 wide straight staitwqr down to ground level. <br />(f.. V <br />(/. <br />> s.' <br />' ‘"■•N ufr <br />5,. <br />K* * > • I - * <br />*p .. »r <br />♦> • * I ' <br />•* <br />***—■■* ■
The URL can be used to link to this page
Your browser does not support the video tag.