My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-2005 Council Packet
Orono
>
City Council
>
2005
>
03-28-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 4:07:34 PM
Creation date
1/11/2023 3:39:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. <br />D. <br />d) building dimensions; and <br />e) tlic locution of (rush and recycling containers and of <br />heating, ventilation and air conditioning equipment. <br />5) F’arking lot construction plans, including confirmation that parking <br />lots and driving lanes will be paved and provided with concrete <br />curb and gutter, and that all driving lanes within parking lots shall <br />have a 9-ton minimum pavement section. A geotechnical <br />evaluation of the soil shall be done in conjunction with the <br />pavement design and shall be submitted to (he City Hngineer for <br />approval. <br />6) Detailed signage plan including monuments signage and wall <br />mounted signage. <br />7) Lighting plan including pole and building mounted lighting. <br />8) Any additional plans and specifications deemed necessary by the <br />City as review progresses. <br />Development Agreement. Development Approval is contingent upon the <br />successful execution of a Development Agreement between the applicant <br />and the (’ity. Such Agreement shall address all specific City requirements <br />for the development. <br />Financial Guarantee. The Development Agreement shall include a <br />financial guarantee by tlie applicant to ensure (he completion of site <br />improvements. The City Hngineer shall complete an estimate of <br />improvement costs, including but not limited to landscaping, grading, <br />erosion control, utilities, driveways and parking areas, trails, sidewalks, <br />retaining walls and stormwater management facility construction, and the <br />applicant shall provide to the City a financial guarantee of 150% of (he <br />improvement costs. <br />Storm Water and Drainage Trunk Fee. The standard Storm Water and <br />Drainage Ifunk Fee for commercial development shall be paid by the <br />Page 9 of 12
The URL can be used to link to this page
Your browser does not support the video tag.