My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-2005 Council Packet
Orono
>
City Council
>
2005
>
03-28-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 4:07:34 PM
Creation date
1/11/2023 3:39:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Architectural Standards for the B-6 District per Zoning Code <br />Section 78-797 (9) a tiirough c and material as represented thus far <br />in the submitted plans. <br />Tlie use of the building is specifically approved for professional <br />office use. Retail uses acce.ssory to the office use may be allowed <br />with the limitation that within any building, retail uses shall not <br />exceed 5% of the gross floor area of that building. <br />Applicants' architect shall submit final development plans to the <br />Metro Council Environmental Services to determine the exact <br />number of SAC units to be charged at the time of the issuance of <br />building pemiits. <br />Applicant shall provide suitable evidence of Minnehaha Creek <br />Watershed District (MCWD) approval of the stormwater <br />management plan before Development Plan Approval will be <br />granted. Erosion control shall adhere to "Best Management <br />Practices for Protecting Water Quality in Urban Areas". All <br />erosion controls as required by the City and by the MCWD shall be <br />in place prior to commencement of excavation on the property. <br />Association documents must be submitted for review by the City <br />Attorney and City Council as part of General Development Plan <br />review. <br />Applicant shall incoqiorate into a.ssociation documents fomiation <br />of a review committee to review/approve uses as they are <br />introduced into the development. The intent of the City is for a <br />self-policing of intensities of uses. <br />Final plat approval, commercial site plan approval, and casement <br />vacations and dedications will be included witliin the General <br />Development Plan review and approval. <br />Tliis concept plan approval is based upon the known issues that <br />may affecl this project, but this approval docs not limit the City <br />Page 7 of 12 <br />I <br />1 <br />i
The URL can be used to link to this page
Your browser does not support the video tag.