Laserfiche WebLink
G <br />H, <br />I. <br />Privateparking lol,drivewayaiidcxtcrioi building lighting. Flighting tyi>e and design shall <br />be compatible with tlie lighting approved for theoverall Stonebay development. Lighting <br />plans shall be subject to review and approval by the City. <br />Surveying and slaking, and setting of Lot and Block monuments as required. <br />Construction of the segmetU ofCa.seadc l.ane within Oullot G, STONF* BAY necessary <br />to provide vehicular acce.ss to the Properly. <br />Any additional improvements listed within the Site Improvement.s Cost Lstimate <br />attached hereto as Exhibit li. <br />7. Coirstruciion of Improvements <br />A. <br />B. <br />C. <br />D. <br />F. <br />G. <br />IF. <br />Commencement Dale - Constmetion ofFniprovements shall begin no later than <br />Completion Pate - All Improvements shall be completed no later than___ <br />T’’e Developer may, however, request an extension of time liom the City. If an extension <br />is gnuiled, it.shall be conditioned upon updating the seen, ity posted by the Developer to <br />reflect cost increases and the extended completion daU. <br />Ccntractors - 'I'lic Developer shall select, retain and supervise the Conlractor(.s) <br />responsible for Improvement construction. The ('ity reserves the right to require <br />satisfactory proof of successful experience and adequate financial status ofany such <br />contractor. Where required byCilyordinance, the contractor.shall first obtain a license <br />from tlie City. <br />Pre-Construction ConF'crcncc - Prior to the start ofany constmetion, the Developer and <br />the Developer’s Cmilractor shall meet with the responsible City officials to review <br />construction plans and .sdiedules. <br />Pcruiiis - Prior to the start of any construction, the I )eveloper’s Contractor shall apply for <br />and receive all necessary penuits from the City and/or govemment agencies having <br />juri.sdiction. Site grading shall not commence until the building permit has been issued. <br />FXwelojKT is advi.sed that ;m I-msion Control Pcmiit must be obtained From the Minneluilia <br />('reek Watershed Di.sliici as well as the required NPDFiS Phase 11 Construction Site <br />pennit, beF'ore commencing any grailing activity on the site. <br />Consiniclion - The constmetion. installation and malci i.ils shall be in accordance with the <br />jdans and specifications approved by the City. <br />Jnspedjon - 'F'hc City through its staffor consultants shall in.spcct the installation ol die <br />improvements to ensure compliance with plans and specifications. The cost of the <br />inspections will be paid by the Developer. <br />■i* <br />AP-4