Laserfiche WebLink
^ jBonestroo <br />Rosene <br />Anderlik & <br />^ I Associates <br />tnglne«fri & Architects <br />West Highway 36 • St. f'aul, MM 55IH <br />Offlre; 65l-636-'l600 • tax 6M-636 1311 <br />www.bonestroo.com <br />b <br />January 1 1, 2005 <br />Mr. Miko Gaffron <br />Planning Director <br />City of Orono <br />Post Onicc Dox 66 <br />Ciyslal Huy, MN 55323 <br />Re: Stonebay <br />l-iloNo. 139-05-000 <br />Plat No. 05-30H1 <br />Dear Mike: <br />Wc have reviewed the revised plans fur the piupuscd Sloncljay Lofts DevclopincnL The site is located along <br />the westerly side oftlic Stonebay subdivision north urKelley Parkway and adjacent to the City's Public Works <br />Building. Wc have the following comments with regards to engineering matters: <br />• Sheet C3.1 shows proposed reUiining wall construction at the underground parking entrance. This wall <br />shown exceeds K-feet in height. All retaining walls that exceed 4-lcet in height require a separate <br />engineered design and detail siihrnittal for review and approval. <br />• *rhc revised plans slujw only one access to the underground parking, whereas the previous submittal had <br />(wo. We would iccoiiiineiid that a second access to the underground parking be added. <br />Stop signs should be added for outbound trafftc from the underground parking. <br />'flic plans should include a pedestrian crossing sign at the crossing shown near the middle oflhe outdoor <br />parking urea. <br />'I'hc applicant should provide the City with the project S WPPP for the Phase II Construction Site Pcmiit <br />and u copy of the Notice of Coverage Certificate prior to starting work on site. <br />'fhe grading plan should include erosion and sediment control details and notes. Items such us fiber <br />blanket instidlation and locution, inlet protection, stockpile locations, silt fence maintenance <br />requirements, coiislruction entrances, and any other issues relating to erosion and sediment control <br />should bo clearly shown on the final plans. <br />I hr final plans should iilentify the name and phone number for enginecnng contact person regarding <br />erosion and sediment control issues. <br />I'hc 3dbot wide sidewalk on the west side of the building is a drainage way. <br />The applicant should provide calculations justifying that the 6-iiidi sanitary and water services arc <br />adequate for the proposed building. <br />P inal plans should inclmlr provisions tor managing sump pump and roof drain water. <br />Parking lot and new roadways are to have B61H curb and gutter <br />Plans shoiilil be submitted to the fire marshal for review of fue hyilranl coverage and lire vehicle access <br />to tlie site. <br />II patios instead ol balconies arc installed on the ground level, t!io grading plan should be icviscd to <br />rliininate the strrpri slopes ciuieiitly sliown along llic north siilc of the building. <br />• St. Tciul, St, C/oud. r ochester, Wilimar, MN • Milwaukee, Wl • Ctilcago, IL <br />Afrirrnjillvv Ac|lnfi/l:c|Uffl OpporluriMy Lmpluyer nmJ ifrifiluyro Uwncil <br />. ..f.V