My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-2005 Council Packet
Orono
>
City Council
>
2005
>
02-28-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:51:41 AM
Creation date
1/11/2023 10:25:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Tuesday, January 18,2005 <br />6:00 o’clock p.m. <br />Johnston indicated the original building peak was at 966.8’, with the new plan calling for a peak height of <br />971.33, which is four and a half feet higher. Johnston pointed out that 3.5 leet in the height is as a result <br />of the need to raise the underground ceiling and issues relating to stormwater. Johnston slated overall the <br />building is onc’-foot higher if stormwater is not factored into the calculation. <br />Rahn commented he likes the stepped roof and the steepne.ss of the roofs, but that he has a concern with <br />the length of the building. Rahn noted the original concept plan had less square footage proposed than <br />this proposal and that the applicant needs to consider reducing the number of units in order to keep the <br />amount of square footage down to what was originally approved. <br />Johnston inquired what the length of the senior housing building is. <br />GafTron stated that it is close to 500 feet. <br />Rahn noted that the City did receive a number of phone calls regarding the size of that structure. <br />Leslie slated he understands the need to make it one building given the issues related to coastnicting two <br />buildings on this site. Leslie stated in his opinion the number of units could be reduced in an effort to <br />reduce the massing. Leslie noted the City had approved the building at a certain square footage and not a <br />number of units. <br />Zachman stated due to the location of the building and street, it would be difficult to get a direct view of <br />the building. Zachman noted there would be conunercial development across the street <br />Leslie pointed out the homeowners located behind this structure would be able to see the full length of the <br />building. <br />Zachman stated the L-shape design of the building will help break up the view and that only one end <br />should be visible. <br />1 Idler stated the Public Works Department would have the most direct view of the building and that in his <br />opinion this structure should not be that visible from Willow Drive. <br />Frilzicr indicated he is in agreement witli Commissioner Leslie’s comments concerning the size of the <br />structure and that there should be a reduction in the size of the units. <br />PAGE 45
The URL can be used to link to this page
Your browser does not support the video tag.