My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2005 Council Packet
Orono
>
City Council
>
2005
>
02-14-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:43:33 AM
Creation date
1/11/2023 10:24:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />COl <br />FEB I 4 2005 <br />DATE: FcbWS^Qf.qilOSO <br />ITEM NO: 12 <br />Department Approval: <br />Name Koii Moorsc <br />Title City Administrator <br />Administrator Reviewed:Agenda Section: <br />City Administrator's Report <br />Item Description: Long Lake Fire Station /Change Order No. 8 <br />Attached is the final change order for the Long l^kc Fire Station construction project (Change Order <br />No. 8). This change order reflects higher costs associated with the final pavement wear course for <br />the Fire Station parking lot. 1*his work was originally intended to be done in the fall of 2002, but <br />Rochon was not allowed to do the work because of the cold weather at that time. The increased <br />costs of $5,665, as reflected in this change order, relate to remobilization costs and increased <br />material and labor costs as a result of doing the work nearly two years later than originally planned. <br />Even with the additional mobilization cost, Rochon’s fee to complete the work was still significantly <br />below a second estimate *hat was obtained by stafTin the spring of2004. Therefore, staff requested <br />that Rochon perfomi the work at the revised cost and the parking lot is now complete. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve Long Lake Fire Station Change Order No. 8 in the amount of $5,665.
The URL can be used to link to this page
Your browser does not support the video tag.