My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2005 Council Packet
Orono
>
City Council
>
2005
>
02-14-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:43:33 AM
Creation date
1/11/2023 10:24:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^5.Signage. Signage on the site shall be limited to the required traffic control signage, <br />building designation signs, and the approved monument signs as shown on the approved <br />Signage Plan attached hereto as Exhibit I. Parking and traffic control signage shall be <br />installed subject to City strff and City Engineer approval. <br />10. Additional Conditions of Approval are documented in tlic Special Conditions Memo <br />attached to tliis Agreement as Exhibit K. <br />B. Development Phasing <br />1. <br />2. <br />4. <br />STONEBAY is intended to be developed in a '.umber of sequential Phar.es over a period <br />of 3-4 years. The various Phases have been designated as Phase One and hiiture Phase j <br />A through D, per the Phasing Plan attached hereto as Exhibit L. Th'. sequential order of <br />development of the various Future Phases has not been absolutely established, but relies <br />to some extent on market conditions and demand. Therefore, tliis Agreement will pertain <br />primarily to the Phase One improvements, and shall be amended as necessary prior to <br />commencement of iinproveiiicnts fc<r each Future Phase. <br />The Pnase One improvements include the construction of Kelley Parkway and associated <br />curb £.nd gutter, sidewalks, lighting, signage and landscaping; construction of municipal <br />sewer and water mains and facilities within the right-of-way of Kelley Parkway; <br />construction of stormwater piping and facilities including the regional pond south of <br />Kelley Parkway; construction of private roads and driveways as well as private and <br />public sewer and water lines and facilities within the area designated as Phase One as <br />shown on Exhibit L; and general site grading for Phase 1 and future Phases. Phase One <br />of the development includes the construction of 28 two-story tewnhome units and 26 <br />rambler townhome units. <br />Commencement of Phase One improvements shall not occur unth Developer has made <br />payment to the City of the prorated portion of the Development Fees (Park Dedication <br />Fee. Stonn Water and Drainage Trunk Fee, and Sewer and Water Connection Charges) <br />for Phase One. Commencement of Future Phase improvements shall not occur until <br />Developer has made payment to the City of the prorated portion of the Development Fee; <br />associated with said Future Phase. The Development Fees for each Phase shall be based <br />on the proportional acreage or number of units within each Phase depending on the <br />method of calculation of each fee, relative to the total project. I'he schedule of <br />Development Fees is attached hereto as Exhibit M. <br />Nothing in tliis Agreement is intended to proliibit the commencement of Future Phases <br />prior to completion of earlier Phases, nor to establish a specific sequence for the various <br />Phases. Completion of Phase I improvements shall be required before commencement of <br />any Future Phase, except that Phase 2 grading and utilities may be commenced prior to <br />completion of Phase 1 improvements. <br />Page 5 of 19 <br />Developer Initial <br />City Clerk Initial <br /><;
The URL can be used to link to this page
Your browser does not support the video tag.