My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2005 Council Packet
Orono
>
City Council
>
2005
>
02-14-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:43:33 AM
Creation date
1/11/2023 10:24:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Tuesday, January 18,200S <br />6:00 o ’clock p.m. <br />results in the building being five feel higher in general. GanVon indicated there was a discussion at the <br />time of the original approval centering around options to reduce the massing and the size of the building. <br />Gaffron requested the Planning Commission give direction to the applicant concerning the size and <br />massing of the proposed building and the visual impacts of tlic added height in light of the proposed <br />location of the building and the other uses proposed along Kelley Parkway. <br />Gaffron noted the applicants have submitted a plan that meets the parking requirements for this site and a <br />stonnwater management plan, which illustrates an above-ground storm sewer system with the majority of <br />the drainage directed to the north. Gaffron indicated the City Engineer has reviewed the stormwater <br />management plan and has made some recommendations. In addition, the applicants are proposing some <br />retaining walls that are slightly different than what was originally approved, with the City Engineer <br />requesting that all retaining walls above eight feet in height be engineered. Gaffron staled the fire <br />marshal has been asked to comment on the layout, the single access to the site, and location of hydrants. <br />Gaffron requested the Planning Commission review the landscape plan for this site. Preliminary review <br />by staff indicates an acceptable level of plantings of trees and shrubs. The developer should also be asked <br />to describe all outside lighting proposed for this building other than the typical street lights, and provide a <br />lighting plan sheet for such lighting. The developer also needs to indicate any identification signage <br />intended for the building. <br />Gaffron noted the impervious surface coverage for this site is limited to 50 percent, which is not an issue <br />in Staffs opinion. <br />Gaffron requested the Planning Commission address the following items: <br />1. Acceptability of building expansion and the conversion from two buildings to one. <br />2.Acceptability of increased building height. <br />3. Acceptability of propo.scd building materials and building design. <br />4. Signage and building lighting. <br />5. Acceptability of landscape plan. <br />PAGE 43 <br />•> ! <br />; <br />k
The URL can be used to link to this page
Your browser does not support the video tag.