My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2005 Council Packet
Orono
>
City Council
>
2005
>
02-14-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:43:33 AM
Creation date
1/11/2023 10:24:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J«n li£ iiUUb 8:a&BOriESTROO R0SEI1E RNOERLIK 6516361311 p.2 <br />provide evidence that the downstream stoi m sewer has the capacity to serve the new proposed use. There <br />should be a catch basin added to the west of CB 11 to reduce drainage across the parking lut at the low <br />point <br />4. Utilities: The horizontal and vertical aligiuner.t of the sanitary sewer between the existing manhole and <br />MH 1 needs to be revised. The new sanitary sewer grade should not exceed 1% and should enter the <br />existing manhole closer to 90 degrees from the out going pipe to the east A drop manhole upstream of <br />the existing line seems to be the preferred solution. Sanitary sewer services arc not allowed to enter <br />manholes as shown at MH 3. The applicant will be responsible for obtaining permits related to t)>e <br />connection to the existing sanitary sewer manhole located within the Miimesota Department of <br />Transportation right-of-way. The sanitary sewer must be located at least 18 inches below the existing <br />water main at their crossings. The City should be notified prior to connections being made to exi.-:ting <br />utilities. The proposed water main coruiections shall be by cutting in a tee, no wet taps are permitted. <br />Final plans should include utility plan and profile vi;;ws. Hydrants should be located at all dead end lines <br />and at all high points. <br />5. Easements: The proposed easement vacations appear appropriate. New utility easements will need to be <br />provided for all constructed water main, sanitary and storm sewer. Drainage casemeiits should be <br />provided across any existing or proposed drainage ways. Drainage and utility easements should be <br />provided 10-feet wide along all common lot lines. All of the lots encroach into the backyard drainage <br />ways and some cover utility lines. There are also no casements provided along lot lines. The lot <br />dimensions should be evised or casements provided os described above. <br />6. Financial Guarantee: When the final plans arc completed we will prepare an estimated cost for site <br />improvements to determine the amount of financial guarantee required. <br />7. Miacellaneous: City standard deuiils must be used for this project. The handicap access to the lower <br />le> of the buildings approaches 400’ in length. The city should review and comment on the length of <br />this access. <br />Please contact me at (65 1) 604-4863 if you have any questions regarding this matter. <br />Yours very truly. <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Tom Kellogg <br />cc: Oreg Gappa. City of Orono <br />V •>.. V
The URL can be used to link to this page
Your browser does not support the video tag.