My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-2005 Council Packet
Orono
>
City Council
>
2005
>
01-10-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 10:42:50 AM
Creation date
1/11/2023 10:23:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
»ICCTI?SJG <br />JAN 1 0 2005 <br />REQUEST FOR COUNCIL ACTION , y ohono <br />DATE; January- 10.2005 <br />ITEM NO.: /O <br />Depai tment Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: Agenda Section: <br />Public Services Director's Report <br />Item Description: Casco Point Road Survey <br />The pavement on Casco Point Road and Dunwoody Avenue has reached the end of its ser\ ice life <br />and needs to be reconstructed, and there are also numerous draitiage probletns in tliis area. 'I'here are <br />also Right of Way issues associated with this project as in some areas there is a very tiarrow or no <br />platted Right of Way. We arc beginning to plan for a future project to reconstruct tlicse streets and <br />improve the drainage system. This project will also address any needed improvements to the utility <br />systems in the project ar ;a. <br />Tlie first step in this proce.ss is to obtain an accurate survey of these streets as we do not have <br />accurate or detailed enough information to plan and design a comprehensive project for road <br />reconstruction and drainage system improvements in this area. Tins survey work is currently being <br />completed as this is an opportune time to schedule this work as the survey crews are available and <br />there is not much snow. The estimated time to complete this surv ey work is appro.ximately two <br />weeks at an estimated cost of $ 13,000. <br />COUNCIL ACTION REQUESTED: <br />Motion to authori/.e the surveying of Casco Point Road and Dunwoody Avenue for a future street <br />rect.nstruction and drainage project, at a cost of$l3,000, and to approve a budget adjustment in the <br />Stormwater I'und to reflect this e.xpenditure.
The URL can be used to link to this page
Your browser does not support the video tag.