Laserfiche WebLink
No. Itom <br />BASE BID: <br />1 MOBILIZATION <br />2 REMOVE EXISTING CATCH BASIN <br />3 12-PVC.SOR26 <br />4 DIRECTIONAL DRILL 12‘HOPE, SDR 17 <br />5 CONNECT INTO EXISTING STORM SEWER <br />6 2'X 3’CATCH BASIN <br />7 27- STORM MANHOLE <br />a EROSION CONTROL BLANKET <br />9 SILT FENCE • TYPE MACHINE SLICED <br />10 CLASS 3 RIP RAP <br />11 SODDING TYPE LAWN <br />Total BASE BIO <br />BASE BID • B<d Amount Total • S24.375.00 <br />Contract Unit Current Quantity Amount <br />Unit Quantity Price Quantity to Date to Date <br />LS 1 1750 00 1 1 $1,750 00 <br />EA 1 600 00 1 1 5600 00 <br />Lf 90 38.50 60 60 $3,080 00 <br />Lf 220 52,00 220 220 $11.440 00 <br />EA 1 300 00 1 1 $300 00 <br />EA 1 950 00 1 1 S950 00 <br />EA 1 950 00 $000 <br />SY 100 300 $000 <br />LF 400 300 150 150 $450 00 <br />CY 6 7000 6 6 S42000 <br />SY 600 500 $0 00 <br />S 18.990 00 <br />Total BASE BIO <br />Total Work Completed To Dale <br />$18.990 00 <br />$18,990 00