My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
08-19-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 3:07:05 PM
Creation date
12/14/2022 2:56:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
—\ <br />CITY of OROX <br />Post OffiCe Box 66 •Crystal Bay. Minnesota 55323 • Municipal Offices <br />QF - <br />QRQIUO^On the North Shore of Lake Minnetonka <br />Apiii 19, 1991 <br />Ben Young <br />3105 Sixth Avenue North <br />Long Lake, MN 55356 <br />James Grabek <br />3050 Jamestown Road <br />Long Lake, MN 55356 <br />Re: Options for Resolving Septic System Encroaclunent <br />Gentlemen: <br />Per our discussion on April 12th, this letter is to define <br />the encroachment of Grabek's septic system into Young's property <br />and offer possible methods for the property owners to resolve <br />this. <br />The new lot <br />12' south of the <br />rockbed ended up <br />in the plan, the <br />concerns, appear <br />if the fence was <br />line as staked appears to be approximately 10- <br />fence line adjacent to the mound. Althovcrh the <br />16' from the fence line rather than 22’ as ni'own <br />sandbed and mound toe in relation to drainage <br />to meet the standards approved for this system <br />the lot line. <br />Based on the newly staked correct lot line, the rockbed at <br />its closest point is about 7' from the line. The sandbed extends <br />at its furthest point, 3' across the line into Young's property. <br />The toe of the mound (the limits of drainage deflection) is <br />approximately 5' over the line at its greatest encroachment. <br />The proximity of the rockbed 7' from the actual lot line <br />precludes the possibility of accommodating the uphill dike and <br />drainage within Grabek's property. <br />construct a retaining wall between the rockbed and the lot line <br />while still leaving an adequate drainageway. <br />Given the circumstances, moving the mound system is not a <br />reasonable alternative. This system has already been added onto <br />once, and additional traffic around it to make changes to it <br />to the east. The following options might be considered as <br />reasonable solutions, for the property owners to consj ‘*** <br />■UILOING 4 ZONING - 473-7357 <br />ASSESSING <br />administration 4 HNANCE - 473-T35* <br />FAX-4734SW <br />PL BLIC WORKS - 473-7359 <br />---—
The URL can be used to link to this page
Your browser does not support the video tag.