Laserfiche WebLink
LOG OF BORING 2 <br />PROJECT <br />Proposed Subdivision <br />OWNER <br />K 1 <br />SITE Treatment Plant <br />Long Lake, Minnesota <br />ARCHITECT-ENGINEER <br />McCombs - Knutson Associates, Inc. <br />ii <br />C <br />LU <br />n5 < <br />IHA <br />IT <br />2Hi2 <br />UJ <br />s <br />H <br />< <br />AHL <br />5HA <br />HLU <br />UJ <br />U. <br />uiOz <br />< <br />5 <br />s <br />(O <br />DESCRIPTION OF MATERIAL <br />r <br />2^ <br />SURFACE ELEVATION, <br />Ice and sludge <br />Sandy sludge frozen to 2.5' <br />Black peat, amorphous to fibrous <br />- (Pt) <br />Gray sandy silt and silty fine <br />.sand - wet - (SM) <br />End of boring at 12 feet <br />Hand augered full depth <br />WATER LEVEL OBSERVATIONS <br />^L.\/ 4 feet while samnlina <br />WL <br />WL ▼ 6 feet after boring <br />CO <br />UJ <br />O 3 <br />LU (/} <br />Ql UJcn cc <br />t <br />$ <br />O <br />UJ <br />D <br />< <br />> <br />UNCONFINEO COMPRESSIVE STRENGTH TCNS rr <br />-o- <br />1+3 <br />WATER <br />CONTENT % <br />STANDARD PENETRATION (BLOWS'FOOT) <br />GME CONSULTANTS, INC. <br />2063 EAST CENTER CIRCLE <br />MINNEAPOLIS. MINNESOTA S5441 <br />BORING STARTED <br />BORING completed 2-12-85 <br />RIG <br />DRAWN KMH <br />JOBA 743 <br />DRILLER GM <br />approved WCK <br />SHEET 2 of 2 <br />The stratification lines represerapproximate boundaries <br />RMCr|pr.VIU