My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
09-16-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 1:41:01 PM
Creation date
12/14/2022 1:23:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
... <br />rearranged now has 1.9+ acres and the Ziesmer property has <br />2+ acres. <br />When probing for suitable primary and secondary septic <br />system sites, several obviously suitable sites v/ere found to <br />not have virgin soil conditions a.id were therefore <br />unsuitable. However, suitable sites have been located on <br />both properties as rearranged. The Ziesmer site requires a <br />side yard setback variance as there are no other suitable <br />sites available on the rearranged Ziesmer site. <br />As you may by now be aware, the owners of both lots <br />under consideration, are eager to see the extension of the <br />sanitary sewer system to this area and understand that it is <br />now again being given serious consideration. For that <br />reason it is the expectation of the owners that none of the <br />septic system sites will ever be put to use. However, if it <br />develops that they are necesary, suitable sites do exist <br />Due to the oncoming cold weather conditions it is <br />necessary that a decision be made on the lot line <br />rearrangement and the variances as soon as is possible. If <br />a favorable conclusion can be arrived at by ooth the <br />planning commission and the city council at their September <br />meetings, construction will start as soon as the building <br />permit can be granted. <br />It is respectfully requested that the lot line <br />rearrangement be approve and the variances be granted so <br />that construction can start ahead of the cold weather <br />season. <br />i ^ <br />’-■>1 <br />lirfili uimiBkt
The URL can be used to link to this page
Your browser does not support the video tag.