Laserfiche WebLink
Clair Rood <br />September lit 1990 <br />Page 2 <br />-hP ncr-h end, you will have to either cross other prccerties or <br />riavel trough Che wetland, neither cf which are surtable <br />options. <br />An additional issue which needs to be addressed is the height o^ <br />the 2- X 2’ brick and concrete pillars you ha-e erected along tne <br />south and west boundaries of the property. <br />understanding that you had already of <br />thirds of these pillars when chrs work came to ^ <br />the Building Inspections Department. A review of the pertinent <br />code sections suggests that along street lot <br />include Kenwood Way, Navarre Lane, ana tecnnically ^ould al <br />include Hillside Place (an undeveloped road^which may become a <br />road in the future), fences are not allowed to exceed 3 1/2 ^ <br />height. <br />Since you proposed that you would be planting hedges between <br />theH /ostJ^, there is some question whether they fall under the <br />definition of a fence. Also, the code is not <br />such posts can exceed 3 1/2' in height in a side '"“J.^jp, <br />(along Navarre Lane) or a rear street yard (along Hillside <br />Place!. We are still researching this, however, you should be <br />aware that there may be an issue about the <br />niilars, and if it is determined that the maximum <br />height is in fact 3 1/2', your options would be <br />at the appropriate height, or to apply for an a ^er hhi<? <br />variance. We will advise as to a final interpretation on this <br />issue. <br />In order to expedite approval for your intended cleanup work, you <br />should do the following: <br />1. Have your surveyor determine the inverts of the <br />and outlet of the culvert that crosses the railroad tracks. <br />He should then determine whether that culvert atfects his <br />previous determination of the wetland boundary. <br />2. Your surveyor should stake the '^ftland boundary <br />approximately every 50', and should likewise stake the 26 <br />wetland setback where no filling, grading, dredging or <br />excavation is allowed. <br />Once a land alteration permit is issued, the following guidelines <br />must be adhered to: <br />1. In areas within 26* of the wetland boundary, debris <br />removal shall be allowed only to the degree that voids <br />caused by such removal shall be restored to the <br />arade elevations. No vehicular or equipment traffic shall <br />be allowed within the boundary of the wetland in any case,