My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-06-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
05-06-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 12:14:10 PM
Creation date
12/14/2022 12:06:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T>ri /•mrrr ’t>t^ <br />'Aj 11J i\£i <br />1 <br />t h /» ?ri <br />J. NICHOLAS RUEHL AIA <br />BERTIL E. HAGLUND. AIA <br />' m: <br />-rv <br />► L- <br />April 24, 1991 <br />Barbara J. Peterson, Mayor <br />City Hall <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />^ ^ 7.1 <br />Re; Proposed City Facilities <br />Dear Mayor Peterson, <br />I learned today that I have been quoted on tl-e matters of <br />size and construction costs for the city’s proposed <br />facilities. I can assure you that this came as a complete <br />surprise. This office has not provided construction costs <br />estimates or recommendations for an appropriate size of any <br />facilities in the City of Orono to any agency or <br />organization. If our firm is ever retained to provide such <br />services, I will be happy to copy the city on all materials <br />developed. <br />Several weeks ago, a Mr. John Farnnam phoned our office and <br />asked if we had experience in designing municipal <br />facilities. He was told that this is an area in which we do <br />have significant experience and he set up a meeting to <br />discuss our work. At that brief meeting I learned that he <br />represented a group of interested residents in Orono. He <br />explained that he was concerned about the proposed size and <br />costs of your planned facilities. I explained to him that <br />we would not critique another architect's design unless <br />hired by the city for a second opinion. I also explained <br />that wo could not comment on the size or design of a <br />building without first studying the space allocation program <br />and feasibility studies. He asked how we would prepare a <br />cost estimate for such a project and I explained that we <br />often use cost consultants, our recent past experience and <br />in the early stages of the work, usually rely on the <br />published cost guides. At his request, I provided him with <br />copies of a few pages from one of these publications. <br />H^l-OS CORPOR^ION <br />J <br />470 Water Street, Excelsior, MN 55331 (612) 474-3291 <br />Pniijal Onnortiinitv Pmnlovpr
The URL can be used to link to this page
Your browser does not support the video tag.