My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1991 Planning Packet
Orono
>
Planning Commission
>
1991
>
01-22-1991 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 12:22:47 PM
Creation date
12/14/2022 12:02:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H- <br />:uu~.*nt 0:-0:'-03 <br />Section: Slope Protection <br />Subject: Hay/Straw Filter Barrier <br />• y U <br />t. Excavaislhelrencti.2 P*ac« and stake straw baies. <br /></ <br />1 \AMg« iooM straw detwMn 4. Bdckfitl arxl compact the <br />excavated soH. <br />Source: Adapted from installation ot Straw ^ FaDnc <br />Fler Samers fdr Sediment Control. <br />Sherwood and Wyant <br />Illustration: Hay/Stra-^ Filter Barrier <br />Staking Each bale must be securely anchored by at least two stakes <br />driven through the bale. The first stake in each bale must be <br />driven toward the previously laid bale to force the bales <br />together. <br />Date <br />4/89 <br />Page <br />2 of 3 <br />C5 “ ■■ <br />( <br />r
The URL can be used to link to this page
Your browser does not support the video tag.