My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-2022 Council Packet
Orono
>
City Council
>
2022
>
10-24-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 12:52:42 PM
Creation date
12/8/2022 12:50:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: A. Carlson Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain council approval of the geotechnical investigation <br />needed to inform the final design and engineering of the Fox Street Project. <br /> <br />2. Background. At the April 11th, 2022 Council Work Session the Council provided direction for 2023 <br />street projects. The streets being considered for 2023 are Fox Street (Brown to Orono Orchard) and <br />Townline Road. Due to the complexities of the Fox Street Project the design effort was divided into two <br />portions: preliminary design and final design. Preliminary design work is complete and the results were <br />briefed to council on September 12th. To inform the final detailed design some additional geotechnical <br />exploration of the section abutting marshland is required. <br /> <br />3. Scope. The overall project scope is the repaving/reconstruction of Fox street between Brown and <br />Orono Orchard. The geotechnical scope of work consists 10 borings and cone penetration tests. <br /> <br />4. Cost. American Engineer Testing (AET) provided a proposal of $14,400 to complete the necessary <br />work. <br /> <br />5. Funding. Funding will come from the Pavement Management Fund as part of the overall project <br />cost. <br /> <br />6. Staff Recommendation. I recommend approval of the proposal from AET. <br /> <br />COUNCIL ACTION REQUESTED: <br />Move to authorize the geotechnical investigation for the Fox Street project by AET for a fee of $14,400. <br /> <br /> <br />Item No.: 4 Date: October 24, 2022 <br />Item Description: Fox Street Geotechnical Investigation (Project #23-001) <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.