Laserfiche WebLink
Minnesota Interagency Water Resource Application Form February 2014 Page 1 <br />Project Name and/or Number: Orono Public Works Facility <br />PART ONE: Applicant Information <br />If applicant is an entity (company, government entity, partnership, etc.), an authorized contact person must be identified. If the <br />applicant is using an agent (consultant, lawyer, or other third party) and has authorized them to act on their behalf, the ag ent’s <br />contact information must also be provided. <br />Applicant/Landowner Name: City of Orono | Adam Edwards | City Administrator/City Engineer <br />Mailing Address: PO Box 66 | Orono, MN | 55323 <br />Phone: 952-249-4600 <br />E-mail Address: <br />Authorized Contact (do not complete if same as above): <br />Mailing Address: <br />Phone: <br />E-mail Address: <br />Agent Name: Bolton & Menk, Inc. | Kristina Bloomquist | Senior Natural Resources Specialist <br />Mailing Address: 7533 Sunwood Drive NW #206 | Ramsey, MN | 55303 <br />Phone: 763-433-2851 Ext. 3324 <br />E-mail Address:kristina.bloomquist@bolton-menk.com <br />PART TWO: Site Location Information <br />County: Hennepin City/Township: Orono <br />Parcel ID and/or Address: 3311823320005, 3311823310013 <br />Legal Description (Section, Township, Range): 32 and 33, 118N, 23W <br />Lat/Long (decimal degrees): <br />Attach a map showing the location of the site in relation to local streets, roads, highways. <br />Approximate size of site (acres) or if a linear project, length (feet): 9.7 acres <br />If you know that your proposal will require an individual Permit from the U.S. Army Corps of Engineers, you must provide the <br />names and addresses of all property owners adjacent to the project site. This information may be provided by attaching a lis t to <br />your application or by using block 25 of the Application for Department of the Army permit which can be obtained at: <br />http://www.mvp.usace.army.mil/Portals/57/docs/regulatory/RegulatoryDocs/engform_4345_2012oct.pdf <br />PART THREE: General Project/Site Information <br />If this application is related to a delineation approval, exemption determination, jurisdictional determination, or other <br />correspondence submitted prior to this application then describe that here and provide the Corps of Engineers project number. <br />A delineation of the project area was completed in 2021. The WCA number is W21 -060; WCA approval for the type and boundary <br />application was received on 1/11/2022. The Corps project number is MVP-2021-0196-RLG; Corps concurrence was received on <br />1/12/2022. <br />Describe the project that is being proposed, the project purpose and need, and schedule for implementation and completion. The <br />project description must fully describe the nature and scope of the proposed activity including a description of all project elements <br />that effect aquatic resources (wetland, lake, tributary, etc.) and must also include plans and cross section or profile drawings <br />showing the location, character, and dimensions of all proposed activities and aquatic resource impacts. <br />The City of Orono is proposing to construct a new public works facility. Included in the project is a public works building, parking <br />areas, material storage areas, utilities, landscaping, and stormwater management features . <br />aedwards@ci.orono.mn.us