My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2022 Council Packet
Orono
>
City Council
>
2022
>
09-26-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 10:58:46 AM
Creation date
12/8/2022 10:45:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: A. Carlson Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to award the construction contract for the New Public <br />Works facility Project. <br /> <br />2. Background. In May of 2021 the city began a design process for a new Public Works Facility at 365 <br />Old Crystal Bay Road. Design work was completed in April and the project put out for Bid. In April Bids <br />came in high so Council rejected them and directed a re-scoping of the project. The project was put out <br />for bid in August. Sealed bids were opened on September 15th. <br /> <br />3. Scope of Work. The project consists of the construction of a new public works facility with <br />associated site work. <br /> <br />4. Cost. The city received six bids. The Bid Summary is at Exhibit A and Letter of Recommendation at <br />Exhibit B. The low bid for was for $16,067,000.00 from Ebert Construction. In addition with the award <br />of the project the city will need to complete the purchase of the required wetland banking credits of <br />$94,655.88 (Purchase agreement at Exhibit C). <br /> <br />5. Funding. Construction will be funded by the Facilities Fund. The wetland credit purchase will be <br />funded by the Stormwater Fund <br /> <br />6. Design Committee Recommendation. The design committee recommends award of this project. <br /> <br />COUNCIL ACTION REQUESTED <br />Move to award the construction of the new public works facility to Ebert Construction for a fee of <br />$16,067,000.00 and authorized the purchase of wetland credits at $94,655.88. <br /> <br />Exhibits <br />A. Bid Tab <br />B. Letter of Recommendation from Oertel <br />C. Wetlands Credit Purchase order. <br /> <br />References <br />A. Orono PW Bid Package <br /> <br /> <br />Item No.: 13 Date: September 26, 2022 <br />Item Description: Public Works Facility (21-039)- Award <br />Presenter: Adam T. Edwards, P.E. <br />City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.