My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-1983 Planning Packet
Orono
>
Planning Commission
>
1983
>
08-15-1983 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2023 2:39:03 PM
Creation date
12/7/2022 3:49:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d - <br />asked for <br />ly 21, 1983, <br />, in order <br />of controlling <br />s only method <br />rip rap is <br />t problems <br />)NR issued <br />le application; <br />July 18, <br />a in order to <br />the drainage <br />rties. The <br />ng adequate <br />unof f. <br />»n in relation <br />ty owner, <br />iwall along <br />»n. There <br />k’s shoreline <br />> the immediate <br />Navin received <br />If » w <br />U' <br />■■ <br />i <br />7^-'5 ^ <br />i . <br />I" <br />- I <br />Ms <br />1535 Bohns Point Rd <br />Conditional Use Permit <br />Page 2 <br />Engineer's Report <br />Please review the engineer's report dated August 5, 1983. His <br />only condition for approval is that the plans must be signed ^ <br />by an engineer registered in the State of Minnesota. This <br />request need not hold up any action by the Planning Commission - <br />if approved by Planning Commission your recommendation would ask <br />that work could not begin until the plans are signed by a <br />registered engineer. <br />Staff Recommendation <br />To approve a conditional use permit for William Ulrich for the <br />installation of a seawall along the lagoon area of his property <br />and 20* of Gerard Blohorn's property subject to the following <br />conditions: <br />1 -Need to face seawall with natural stone rip rap - <br />Planning Commission may recommend against this <br />condition as this is based on overall visual effect <br />of seawall on mainlake and lagoon is in a secluded, <br />protected area. <br />2 -Proposed pathway along edge of seawall must be pervious <br />to water and made of a natural material. <br />3 -Prior to applicant obtaining a building permit for <br />seawall construction, he must submit plans signed by <br />a licensed registered engineer. <br />4 -Applicant must obtain a permit from the M.C.W.D. for <br />installation of seawall. <br />N I <br />t:.- <br />Mi, <br />2335 hU. . <br />St. fimmt, <br />PUtttm: 512^536 “* <br />MHWuu /‘300 <br />August <br />City 01 <br />Box 66 <br />Crysta; <br />Attn: 1 <br />Re: Fi <br />Wi <br />Dear J <br />We hav' <br />Bohns ! <br />Minneti <br />lake b' <br />The pi. <br />City r <br />Mlnnes <br />Yours • <br />BONEST <br />Glenn <br />GRC:11 <br />6256b
The URL can be used to link to this page
Your browser does not support the video tag.